background image

Fitment of the primary nozzle into the mixer body 

•  Remove the dome cover and unscrew the lock nut. 
•  Take hold of the cartridge and with a gentle circular motion pull the cartridge straight out of the mixer body. 

Note: Do not turn the cartridge.

•  Fit the recommended nozzle into the cartridge as shown as per the table.
•  Refit the cartridge ensuring that the 2 outer seals are in place. Refit the lock nut applying a torque of 12 Nm 

and refit the dome cover.

JET SELECTION:

Equal Pressure Systems

Fit mixer as supplied.

Unequal Pressure Systems 

If the system is supplied by a pressure pump, ensure that 

the pump can maintain 300kPa at the cold Inlet. If not, 

install a low pressure cold feed and install the mixer as if for 

a low pressure equal system.

Use the following table to determine the nozzle to be used.

17-25 kPa 

Black

25-50 kPa 

Green

50-90 kPa 

Yellow

90-130 kPa 

Red

Hot Pressure 

Primary Nozzle

• 

Step 2
For thin wall linings (eg acrylic showers):

•  Position mixer body on horizontal support with the front edge of the black spacer flush with front of the 

horizontal support.

•  If necessary, loosen the plastic cover and leave in place during the installation.

For thicker wall linings (eg tiles):

•  Remove black spacers from under the mounting bracket. 
•  Position mixer body on horizontal support with the front edge of the mounting bracket flush with front of 

the horizontal support.

•  Secure mixer body to the horizontal support with four suitable screws, ensuring it is oriented square.
•  Alternatively, the mixer can be mounted to support timber behind the mixer maintaining the same 

placement as above.

Step 3

•  Flush all pipe-work thoroughly prior to the next step.
•  Connect hot and cold supplies and outlet to mixer body ensuring a good seal at each joint.
•  Leak test installation prior to closing wall cavity.
•  The seal integrity of pipe joins is the responsibility of the installing plumber.

Step 1

•  Refer to section above for correct nozzle selection.

•  Install a horizontal support at the required height for correct positioning of the mixer.

Ensure front of horizontal support is in line with front of the framing.

Step 4

•  Wall lining hole should be cut or finished as per the dimension shown in the diagram on the right.
•  Allowable distance from front of horizontal support to finished wall surface:
 

– With spacer = 2 – 22mm

 

– Without spacer = 8 – 28mm

IMPORTANT: 

Before you begin, turn off the water supply.

Step 5

•  Remove plastic cover. Do not discard the screws.
•  Apply silicone to the faceplate to create a seal with the finished wall surface. Ensure the silicone 

does not block the notch in the faceplate.

•  Slide faceplate onto mixer body, and position faceplate with notch towards the bottom.
•  Fasten faceplate to the mixer body with screws previously removed.
•  Stretch o-ring over faceplate cover (if provided). Do not roll o-ring as this may cause assembly 

issues. Slide faceplate cover onto mixer body and press into faceplate recess.

•  Push handle on to cartridge lever and tighten grub screw firmly with hex key provided.

Vertical Framing

Horizontal support

Front edge of spacer

Front edge of 

mounting bracket

Outlet

Cold

Hot

100mm ±2

2 – 22mm 

with spacer
8 – 28mm 

without spacer

Reviews: