5
AROYA
Follow the steps listed in
to set up the AROYA Router Climate.
Table 3 Router Climate (H111) Installation
Tools Needed
Grow light hanger (e.g., rope ratchet clip hanger)
Chain/cable/rope
Preparation
Consider the Surroundings
METER recommends installing the Router Climate in the center of each room
of the greenhouse to facilitate quality communication to the Gateway.
The Router Climate should be in an area where the environment is as
consistent as possible. If a fogger is set up in the center of a room, set up the
Router in a location away from the fogger.
Mounting
METER recommends installing the Router Climate in the center of each room
of the greenhouse to facilitate quality communication to the Gateway.
Configuration
All system configuration work is done at METER before installation occurs at
the customer site.
Connecting
Connect Router to Internet and Verify
Connect a CAT 5/6 Ethernet cable (or better) to the Router Climate and to an
Ethernet injector module.
Verify the Router Climate is connected to the internet and functional by looking
for a steady blue LED light on the surface shown in
Follow the steps listed in
to set up the AROYA Sensor Station.
Table 4 H310 Sensor Station Installation
Preparation
Consider the Surroundings
The Sensor Station should be set up at predetermined intervals along the table
where plant cubes or coco bags are located.
Check Sensor Functionality
Press function button until the LED flashes green.
Mounting
Insert plant cubes or a coco bag into the sensor station and set the sensor
station on the table or shelf with other plants.
Configuration
All system configuration work is done at METER before installation occurs at
the customer site.
Summary of Contents for AROYA RST-W2-P-110-SMA-H
Page 1: ...AROYA...
Page 34: ......