Metcalfe 5P101 Installation & Operating Instructions Manual Download Page 13

12 

Operation 

Full operational instructions can be found on the side of each peeler. 

The machine works off 230volt 50Hz 1 Phase supply and comes fitted with a 3-pin 13amp fused plug. 

1.

 

Ensure that the chute door is closed. 

2.

 

Turn on the machine by pressing the green start button. 

3.

 

Turn on the water supply. 

4.

 

Remove the rubber lid and load the potatoes through the top of the peeler and replace the lid. 

DO NOT

 load the potatoes before running the unit as this will damage the bearings, shaft 

assembly & motor and will void the warranty. 

5.

 

Carefully remove rubber lid to check peeling progress. 

6.

 

Once peeled, open the door whilst the machine is still running to discharge the potatoes into a sink 
or bucket. 

7.

 

Once empty, you can then switch the machine off. 

DO NOT

 at any point put your hand or any implement into the machine, whilst it is in 

operation. 

 

Cleaning Instructions 

Daily cleaning should be considered mandatory for all equipment used in the preparation of food.  Once 

your peeler has made contact with any food product, the entire peeler, including removable parts must 

be thoroughly cleaned.  This process is to be repeated essentially at least once a day, or at the end of 

each operation period.  If the machine has not been used for a while it must be cleaned before use as 

well.  

1.

 

Switch off unit at socket. 

2.

 

Remove metal lid. 

3.

 

Unscrew the fixing screw securing the rotor plate using the box spanner provided. 

4.

 

Lift out the rotor plate using the lifting hook provided. 

5.

 

Turn on cold water supply to clean the inside of the chamber with a nylon brush. 

6.

 

To clean the rotor plate, wash in cold water 

ONLY

 using a nylon brush.  

NEVER 

wash the plate in hot water or in a dishwasher as this will remove the coating. 

7.

 

Use a damp cloth to wipe the outside of the unit. 

DO NOT 

use cleaning materials containing abrasives or bleaches. 

 

 

Summary of Contents for 5P101

Page 1: ...t 01766 830 456 e sales metcalfecatering com w www metcalfecatering com Metcalfe EP10 NA10 EP15 NA15 10lb 4 5kg 15lb 6 8kg Bench Mounted Peelers Installation Operating Instructions EP10 NA15...

Page 2: ...1...

Page 3: ...tal Installation 8 Water Supply Connection 9 Waste Outlet Connection 9 Installation Kit 10 Waste Disposal Adaptor 10 External Interceptor 11 Tundish 11 Operation 12 Cleaning 12 Maintenance 13 How to A...

Page 4: ...ler Water Inlet Aluminium Lid On Off Switches Rubber Door Gasket Rotor Peeling Plate Door Cam Motor Casing Cover Waste Outlet Peeling Chamber Guarded Chute Attachment Holes optional extra Door Handle...

Page 5: ...on the other Inside wall of peeling chamber has patented cast in abrasive serrations which dispenses with the need for abrasive coating Consequently there is less potato loss during both peeling and...

Page 6: ...5 EP10 NA10 Drawing EP15 NA15 Drawing...

Page 7: ...ain Length of Waste Pipe Elbow Coupling Product Code 9T18 Metcalfe waste pipe elbow coupling designed for use with both the 4 5kg or 6 8kg potato peelers Allows discharge of waste and water from machi...

Page 8: ...8kg potato peelers the Metcalfe pedestal provides a permanent stable location for your commercial potato peeler Perfect for freeing up valuable counter space the pedestal is designed to hold the peele...

Page 9: ...low these instructions to install your peeler securely Trolley Installation Once the trolley is in place ensure that the castors are locked to prevent the trolley moving during operation Place the pee...

Page 10: ...ning onto the water inlet bush Ensure the assembly is tightened securely to eliminate leakages Also ensure the water inlet valve is pointing directly upwards otherwise the air gap does not function co...

Page 11: ...enables the waste pipe to be connected direct to the drain It gives an additional water supply to the waste outlet to flush away the sludge The waste disposal adaptor fits onto the waste outlet on th...

Page 12: ...lation Tundish optional extra The use of a tundish meets the requirements of water regulations G19 1 G19 3 G19 4 contained in The Water Supply Regulations 1999 and the Water Byelaws 2000 Scotland The...

Page 13: ...machine whilst it is in operation Cleaning Instructions Daily cleaning should be considered mandatory for all equipment used in the preparation of food Once your peeler has made contact with any food...

Page 14: ...e parts accessories and service support including breakdown drawings and parts lists please contact us on the details below Please always quote the Serial Number of the machine This can be found on th...

Page 15: ...ically void all warranties in their entirety All Metcalfe slicers except Simple Line are covered by a 2 year warranty 1st year parts and labour 2nd year parts only and full after sales service All Met...

Page 16: ...the Metcalfe portfolio NS Slicer Range Mixer Range Ceado Roband 3 2021 Metcalfe Catering Equipment Ltd Haygarth Park Blaenau Ffestiniog Gwynedd LL41 3PF t 01766 830 456 e sales metcalfecatering com w...

Reviews: