Attention: Y1 & Y9 must be placed into the channel of
L04A/L01A at the same time.
Make sure all the panels are in the right position
before fixing Z02.
Fix L04A onto 01-L02B as shown, using Z02.
Insert L11 into L04A as shown,
and fix it with L04A using Z02;
Slide Rubber J03 into
the channel of 01-L02A.
Fix 01-L02A with L01A and L04A, using Z01 & Z02.
7