Metal Sistem SUPER 1-2-3 SHELVING Instructions For The Correct Assembly Download Page 9

18b. 

17b. 

17c.   

9

SUPER 1-2-3 - Assembly instructions

cod: 

ISTM027

classification : CONTROLLED

Secure the safety pin tapping it in 

position as shown.

Compact safety pin

: suited for 

both single and double side 
installations.
Position by hand the safety pin on 
top of the beam at the inside face 
of the upright.

PVC safety clip

: suited for the 

central beam of double side bays 
only.
Install by hand on the first 
connection nib above the beam.

Summary of Contents for SUPER 1-2-3 SHELVING

Page 1: ...o TN tel 39 0464 303030 fax 39 0464 303031 www metalsistem com info metalsistem com Instructions for the correct assembly of the SUPER 1 2 3 SHELVING cod ISTM027 04 2019 1 Controlled Assembly instruct...

Page 2: ...bracing components For each available frame height the manual provides number of horizontal bracing number of diagonals location in height of each component position referred to frame axis of each co...

Page 3: ...f the connection lugs align the diagonal is correct Both diagonal and horizontal spacer bars contain a central ribbon A present between the connection lugs This locks behind the upright connection lug...

Page 4: ...tal spacer bar against the uprights and hammer in position until the component is seated and the safety clips are activated If the horizontal spacer bar is difficult to seat twist the upright until th...

Page 5: ...Assembly instructions cod ISTM027 classification CONTROLLED Rotate the frame Assemble the first face of the frame following MT 08 Assemble the second face of the frame following MT 08 and repeat the p...

Page 6: ...shown then knocking it in the final position with the plastic tipped hammer Assemble the beams to the frames starting from the rear of the bay Approach the frames at an angle and press in position as...

Page 7: ...ONTROLLED Complete assembly with plastic capped hammer Use the back of the palm to press the beam in position Repeat at the opposite upright The upright may be rotated to assist Beam correctly assembl...

Page 8: ...ly of the rear beams before assembling the front beams Bend the upper end of the ribbon onto the beam Three safety pin models may be used First safety pin not suited for the central beams of double si...

Page 9: ...ing it in position as shown Compact safety pin suited for both single and double side installations Position by hand the safety pin on top of the beam at the inside face of the upright PVC safety clip...

Page 10: ...19 20 SUPER 1 2 3 Assembly instructions 10 cod ISTM027 classification CONTROLLED Place the shelving panels in position Assembly complete...

Page 11: ......

Page 12: ...METALSISTEM S p A Viale dell Industria 2 38068 Rovereto TN Italy tel 39 0464 303030 fax 39 0464 303031 info metalsistem com www metalsistem com...

Reviews: