background image

 

33 

 

Start-up report 

(METAL FACH Jacek Kucharewicz company's copy) 
 

In order to verify your purchase and warranty validity please send the report on the start-up within 30 

days. You can do it by: 

3.  E- mailing the scan or photo of the report. 
4.  Sending a letter with the copy of the report, the company's address can be found at the end of 

the manual. 

 

Boilre room 

Valid 

Invalid 

Comments 

In  compliance  with  the  conditions  of 
chapter  12.  Boiler  room  and  boiler 
installation requirements

 

 

 

 

In  compliance  with  the  conditions  of 
chapter  17.  Connecting  the  boiler  to  the 
chimney

 

 

 

 

Central heating system 

Valid 

Invalid 

Comments 

In  compliance  with  the  conditions  of 
chapter  14  Connecting  the  boiler  to  the 
heating system

 

 

 

 

In  compliance  with  the  conditions  of 
chapter 

15. 

Expansion 

vessel 

requirements

 

 

 

 

There is no other heating source. If there 
is, how does it affect the operation of the 
boiler?

 

 

 

 

Anti-freeze protection of the boiler 

 

 

 

 

Connecting the components to the 
electrical system 

Valid 

Invalid 

Comments 

The conditions are in accordance with the 
Operation 

and 

Mainteneance 

Documentation in the chapter: 
16.  Connecting  the  components  to  the 
electrical system.

 

 

 

 

Components test

 

Valid 

Invalid 

Comments 

The  sensors  are  placed  in  the  correct 
places.

 

 

 

 

The  readings  are in accordance with  the 
actual state.

 

 

 

 

The fan rotation is correct.

 

 

 

 

Opening the blower door with blow power.

 

 

 

 

The screw rotation is correct.

 

 

 

 

Boiler start-up

 

Valid 

Invalid 

Comments 

The hydraulic connection to the system is 
tight.

 

 

 

 

Fireman/Strażak system test (if installed)

 

 

 

 

Checking the connection between the fuel 
feeder and boiler.

 

 

 

 

Stoking fuel to the fuel bin. 

 

 

 

 

Checking the coal feed by the feeder

 

 

 

 

Boiler start-up in accordance with chapter 
20. Boiler start-up

 

 

 

 

Initial  regulation  of the  boiler  parameters 
settings.

 

 

 

 

Final  regulation  of  the  boiler  parameters 
settings.

 

 

 

 

 

Personal data given in this form are processed by Jacek Kucharewicz, conducting economic activity 

under  the  company  name  Metal  Fach  Jacek  Kucharewicz,  16-

100  Sokółka,  ul.  Sikorskiego  66,  NIP 

(Taxpayer Identification Number): 545-100-10-62, telephone 48 85 711 94 for the purpose of 
performing the  provisions  set  forth  in  the  guarantee terms  -  pursuant to the  act  of  29  August  1997  on 
personal data protection (consolidated text: Journal of Laws of 2014, item 1182). The User has the right 
to access their personal data, correct them, demand cessation of processing of their personal data, as 
well as to raise an objection against processing of data in cases specified by the law. Any correspondence 
concerning processing of personal data is to be addressed to: Metal Fach Jacek Kucharewicz, 16-100 

Sokółka, ul. Sikorskiego 66. Providing personal data is voluntary. Pursuant to the act of 29 August 1997 

on personal data protection (consolidated text: Journal of Laws of 2014, item 1182), we hereby inform 
that  the  personal  data  given  in  this  form  will  be  subject  to  protection  against  access  by  unauthorized 
persons. 

 

 

 

Summary of Contents for SMART EKO

Page 1: ...SMART EKO SMART PLUS OPERATION AND MAINTENANCE DOCUMENTATION ENGLISH TRANSLATION OF THE ORIGINAL MANUAL ISSUE II 2019 06 01...

Page 2: ...rent norms and standards guaranteeing safety and dependable use Using the device in accordance with the provided manual ensures effective and dependable operation The boiler is not meant to be operate...

Page 3: ...ice 23 Conformity declaration WE UE 25 Warranty Card for the steel boilers central heating water boilers 27 Warranty claim 29 Start up report 31 Start up report 33 List of tables Tab 5 1 Boiler equipm...

Page 4: ...USER The maintenance and operation documentation is a part of the product that comes with the delivered boiler The Operation and Maintenance Documentation contains data concerning the design installa...

Page 5: ...the instruction manual of the regulator fan and feeder along as well as the burner ATTENTION METAL FACH reserves the right to implement changes to the parametres equipment and specification of the of...

Page 6: ...2 15 20 25kW 30kW 180mm does not have a damper The ash pan for waste material from the furnace is situated under the burner The steel door is lined with insulating panels from the inside The boiler is...

Page 7: ...kW 25 kW 30 kW A 1250 1250 1250 1300 1300 B 545 545 545 590 590 C 1300 1300 1350 1350 1450 D 545 545 615 710 710 E 1100 1100 1150 1150 1250 F 375 375 445 535 535 G G3 4 G3 4 G3 4 G3 4 G3 4 H G11 2 G11...

Page 8: ...5 Boiler efficiency 91 1 93 3 91 5 91 9 89 3 Single fuel load L 200 200 200 200 200 Fuel Grade II class a1 hard coal compliant with section 5 3 Table 7 of standard PN EN 303 5 2012 Power supply 230V 5...

Page 9: ...de from noncombustible material Its outlet should be installed under the ceiling of the boiler room The exhaust duct should lead out over the roof and placed in the close vicinity of the chimney No sh...

Page 10: ...d with adjustable feet The boiler must be set in the vertical position 1 Check that four adjustable feet have been provided 2 Level the boiler in relation to the floor if the position of the boiler is...

Page 11: ...floorings C3 Easily ignited Asphalt plywood celluloid compound polyurethane polystyrene polyethylene plastics PVC 13 Connecting the boiler to the heating system INSTALLER The connecting of the boiler...

Page 12: ...l pipe RB Safety pipe T1 Temperature P1 Pressure Schematic 13 2 Connecting boilers to the heating system diagram Tab 13 2 Symbols applied in the schematics Designation Key T Temperature sensor Tk Boil...

Page 13: ...or 4 Mixer 5 Heater 6 Heating circle 7 Floor heating 8 Central heating pump CO Schematic 13 4 Connecting the boiler to the heating system with Laddomat and buffer 9 Central heating pump CO 10 Hot tap...

Page 14: ...temperature difference between the hot fumes and cold air proper chimney height the chimney diameter should be no less than 20 x 20 cm chimney properties smooth surfaces inside and outside grout tight...

Page 15: ...d to keep the fumes temperature 180C above the outside temperature and the water temperature in the boiler should not be lower than 60C In such situation keeping an appropriately low temperature in th...

Page 16: ...ls must be kept clean The walls and the grates in the burner chamber should be cleaned through the charger and burner doors The boiler exchanger should also be cleaned regularly Convection channels an...

Page 17: ...cle Sensors Boiler sensor Feeder sensor Hot Tap Water Sensor Controllers MASTER 530 Regulator PLUM 860xx Regulator TECH ST 483Regulator Fan RMS 120 Fan Feeder Motoreducer with engine Feeder motor Feed...

Page 18: ...ealant on the door Regulate the airflow Regulate the controller or call the helpline Why is there grime in the boiler There are few conditions in which grime collects in the boiler e g wet fuel bad co...

Page 19: ...ely open The feeder engine is working but not stoking The engine is working but not stoking because the pin is off or the feeding screw is worn off Replace the pin Replace the feeding screw The feeder...

Page 20: ...ion of cool air If the chimney diameter is too small you can install an extraction fan There is water coming from the convection channels The fuel used is wrong or the humidity is too high Combustion...

Page 21: ...20...

Page 22: ...e guidelines given in the appliance s Operation and Maintenance Documentation 5 Performance of first boiler start up within 6 months from the date of the appliance s installation by the fitter in acco...

Page 23: ...y a specialized company indicated by the Guarantor 6 Performance of the obligations arising from the guarantee will occur within 14 work days counting from the date on which the appliance is made avai...

Page 24: ...23 Confirmation of performance of inspection guarantee repair maintenance service Item no Date of performance Description of performed activities Contractor s signature and seal 1 2 3 4 5 6 7 8 9...

Page 25: ...24 10 11 12 13 14 15 16 17 18 19 20...

Page 26: ...W 2 Norm PN EN ISO 12100 2012 Safety of machinery Basic concepts principles for design part 1 Basic terminology Methodology 3 Norm PN EN 1708 1 2010 Welding Basic welded joint details in steel Part 1...

Page 27: ...26...

Page 28: ...ms pursuant to the act of 29 August 1997 on personal data protection consolidated text Journal of Laws of 2014 item 1182 The User has the right to access their personal data correct them demand cessat...

Page 29: ...28...

Page 30: ...ty in accordance with the Personal Data Protection Act dated 29 08 1997 Dz Ust No 133 item 883 legible signature of Purchaser The Producer is obligated to take warranty actions within 14 days from rec...

Page 31: ...30...

Page 32: ...is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feeder and boiler S...

Page 33: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 20...

Page 34: ...screw rotation is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feed...

Page 35: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 20...

Page 36: ...35...

Page 37: ...36...

Page 38: ...METAL FACH JACEK KUCHAREWICZ UL SIKORSKIEGO 66 16 100 SOK KA TEL 48 85 711 94 54 WWW METALFACH COM PL SERVICE INFOLINE CALL US 48 663 453 222 WRITE TO US p czepiel metalfach com pl...

Reviews: