SECTION 1: INTRODUCTION
Space-Pak System Design.......................................
Code Compliance.....................................................
Air Distribution Requirements...................................
Air Distribution Components.....................................
Warranty Information................................................
Shipment of Unit.......................................................
SECTION 2: SYSTEM INSTALLATION
Step 1: Locating The Unit.........................................
Step 2: Cutting Return Air Opening..........................
Step 3: Attaching Supply Air Plenum Ring...............
Step 4: Setting The Unit............................................
Step 5: Installing The Condensate Trap & Line.........
2
2
2
3
5
5
6
8
9
11
12
Step 6: Wiring The Unit.............................................
Step 7: Installing Air Distribution Components..........
SECTION 3: START UP & OPERATION
Sequence Of Operation.............................................
Prior To Start-Up........................................................
System Start-Up & Adjustements..............................
Charging Cooling Only Systems ..............................
SECTION 4: MAINTENANCE
Before Each Cooling Season....................................
If System Fails To Operate........................................
Parts List...................................................................
12
13
17
17
17
17
18
18
19
IN UNITED STATES: 260 NORTH ELM ST. WESTFIELD, MA 01085 (413) 564-5530/FAX (413) 564-5815
IN CANADA: 5211 CREEKBANK ROAD, MISSISSAUGA, ONTARIO, L4W 1R3 (905) 625-2991/FAX (905) 625-6610
Central Air Conditioning Series
2 to 5 Tons
Fan Coil Unit/Air Supply
Components
MODEL
ESP-D SYSTEM
INSTALLATION,
OPERATION
& MAINTENANCE
MANUAL
ESPD2-301
42-9469