When installing APs in an air-handling space, as described in Article 300.22(C) of the
NEC (2005), the unit should only be powered by the Ethernet port (PoE), not by the
AC-powered power supply.
When the product is installed in air-handling spaces, the cables employed should be
suitable under NEC Articles 300.22 and 725 and marked accordingly, for use in
plenums and air-handling spaces with regard to smoke propagation, such as CL2-P,
CL3-P, MPP or CMP.
The products should be installed in accordance with all applicable, local regulations
and practices.
Summary of Contents for AP332
Page 2: ......
Page 12: ... 2012 Meru Networks Inc About This Guide About This Guide xii ...
Page 18: ...6 Meru Access Point Installation Guide 2012 Meru Networks Inc AP300 ...
Page 50: ...38 Meru Access Point Installation Guide 2012 Meru Networks Inc Warnings ...
Page 62: ...50 Meru Access Point Installation Guide 2012 Meru Networks Inc AP300 Plenum Requirements ...
Page 71: ... 2012 Meru Networks Inc Optional External Antennas 59 Figure 31 Antenna Leads ...
Page 72: ...60 Meru Access Point Installation Guide 2012 Meru Networks Inc ...
Page 73: ...Meru Networks Inc 894 Ross Drive Sunnyvale CA 94087 408 215 5300 www merunetworks com ...