Page 22
Mealstream Ovens 32Z3387 Issue 2
Membrane Panel Circuit
You will need:
A Digital Multi-meter (D.M.M.)
1. Isolate the oven from the mains supply.
2. Remove the Logic Assembly from the Control Panel Housing.
3. Unplug the membrane “tail” from the Logic PCB Assy.
4. Using a D.M.M., check for continuity between the correct terminals when the
pads are pressed.
5. When the panel has been tested, re-assemble and re-test the control housing.
1
10
Summary of Contents for Mealstream
Page 25: ...Page 25 Mealstream Ovens 32Z3387 Issue 2 CIRCUIT DIAGRAM Series 5 Part 1 ...
Page 26: ...Page 26 Mealstream Ovens 32Z3387 Issue 2 CIRCUIT DIAGRAM Series 5 Part 2 ...
Page 27: ...Page 27 Mealstream Ovens 32Z3387 Issue 2 CIRCUIT DIAGRAM CD2 Part 1 ...
Page 28: ...Page 28 Mealstream Ovens 32Z3387 Issue 2 CIRCUIT DIAGRAM CD2 Part 2 ...
Page 29: ...Page 29 Mealstream Ovens 32Z3387 Issue 2 US circuit diagram ...