MANUFACTURER
Mod.
..................
..........V
..........Hz
..........W ..........A
Freon R134a
kg.............
Classe T
MADE IN ITALY
WATER COOLERS
1
Model
2
Supply voltage
3
Quantity of cooling gas
4
Class
5
Total absorption
6
Frequency
7
Serial number
8
Construction year-month
APPLIANCE DATA PLATE
1
2
5
000100 0102
7
8
6
3
4
CONFORMANCE
STATEMENT
This appliance has been manu-
factured with suitable materials
for use with drinking water. The
device conforms to L.D. 108 dated
25.01.1992. The appliance has
been approved by the WRAS
(WATER REGULATION ADVISO-
RY SCHEME).
.
This product was designed,
made and put on the market
respecting the following con-
formities:
• Following
EC
requirements
safety objectives of the
“Low Voltage” 2006/95/
CEE;
• protection
requisites
of
“EMC” 2004/108/ CEE
• Certified
by
NEMKO
.
• Keep this book for later use.
• When you have removed the packaging, make sure that the appliance is not da
-
maged. Any damage must be reported to your carrier within 24 hours.
In order to use your appliance to its best, we advise reading these
instructions carefully as they contain useful information.
• Make sure that installation and electrical wiring are carried out by a qualified
technician according to the manufacturer’s instructions and to the local norms in
force. The electrical system must be equipped with an effective earth according
to the law (46/90).
1.2
GENERAL PRECAUTIONS AND SUGGESTIONS
• Do not pull on the supply cable in order to remove the plug from the socket.
• When the appliance has been installed, make sure it is not resting on the mains
supply cable.
1.1
WARNINGS
1
BEFORE USING THE APPLIANCE
GB
Before carrying out any maintenance or cleaning operation,
remove the plug from the mains socket.
The data and characteristics indicated in this manual do not
bind the manufacturer, who reserves the right to make all the
modifications deemed necessary, without having to give prior
notice or replacement.
If the machine has been put down or turned upside down, wait
for at least 8 hours before putting it into operation
2