Step 15
Level the rail and mark the position of the bracket on the wall,then mark the fixing point.
Step 16
15A
15B
2.5mm ALKEY
15C
16A
16C
Drill holes for the rail
16B
16D
2.5mm ALKEY
16E
INSIDE
16F
4mm ALKEY
MG6x30PLUG
MS8RAWBR
S8GRBSC
S8TRSET
MGST4
×
30BH
11
6mm