28
For disassembling the covers:
1. Workers should lift up the cover.(Fig A)
2.Worker should remove the cover, place it on the flat ground.
For cover installing, please follow the above steps in the reserve way.
For battery installationprocess, if the ‘left’ and ‘right’ battery cable are connected
incorrectly (in the revers way), it would resultthe failure of tiller functional, please
re-check connections.
Fig A
Fig A
Fig B Fig C
28
For removing batteries:
1. Disconnect two battery cable. (Fig A)
2. Tear apart the batteries velcro belts. (Fig B)
3. Both workers should lift up the battery at the same time to remove the battery
from the scooter. (Fig C)
4. Both workers should move the batteries and place it on the flat ground.
For battery installation, please follow the above steps in the reserve way.
Summary of Contents for S2455
Page 1: ...S930A S940A S2455 ...
Page 2: ......
Page 8: ...08 06 ...
Page 9: ...07 ...
Page 10: ...08 ...
Page 11: ...With in 500mm run up 09 2 in 5 cm 2 5cm ...
Page 12: ...10 ...
Page 14: ...12 ...
Page 16: ...14 ...
Page 18: ...16 ...
Page 22: ...20 20 ...
Page 23: ...21 21 ...
Page 24: ...22 22 ...
Page 25: ...23 23 ...
Page 26: ...24 24 ...
Page 27: ...25 25 ...
Page 31: ...29 I O I O 29 ...
Page 32: ...28 30 Seat ...
Page 33: ...27 31 ...
Page 34: ...32 Optional 32 Optional ...
Page 35: ...33 7 7 32psi 2 2bar 220kpa air 32psi 2 2bar 220kpa 33 Optional ...
Page 36: ...34 7 34 ...
Page 37: ...35 7 35 ...
Page 38: ...36 7 36 ...
Page 41: ...38 39 IPx4 ...
Page 42: ...Rev 0 03 06 2015 ...