OPERATION AND MAINTENANCE MANUAL mcr LAM vents
Page 15 of 20
Figure 17. Pneumatic diagram showing connection of mcr LAM louvered vent fitted with a pneumatic actuator (type control C2)
with the alarm and ventilation boxes
3
2
1
4
1. mcr LAM vent fitted with a pneumatic actuator
2. TAVZ thermal release valve (fitted in the
actuator)
3. AK series alarm box
4. Ventilation box with a priority valve (such as
LUK2 or PLZ)