![Mercia Garden Products TULIP PLAYHOUSE 02TUL411411-V3-PEFC General Instructions Manual Download Page 6](http://html1.mh-extra.com/html/mercia-garden-products/tulip-playhouse-02tul411411-v3-pefc/tulip-playhouse-02tul411411-v3-pefc_general-instructions-manual_1772734006.webp)
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
P 6
Please retain product label and instructions for future reference
Step 11
At the back of the building, fix the two
Cover Trims
(No. 13)
to either end of the
side panels.
Use 3x30mm screws per trim.
3x30mm screws
12
12
30mm
screw
Pre drill
hole
Step 12
Fix Fascias
(No. 14)
and Finials
(No. 14)
using 40mm screws.
Pre drill holes to avoid splitting. Ensure to
the trap the felt between the fascia and
building.
12x40mm screws
40mm
screw
Pre drill
hole
14
17
14
Step 13
Place a Window Frame Cross
(No. 9)
against
the inside of each window. Position the frame
centrally to the window and fix using
4x20mm screws per frame.
Place the Wooden Door Handle
(No. 22)
on the outside of door and use a 60mm screw
from the inside to secure. Pre drill hole first
to avoid splitting.
On the inside of the door opening fix the
Ply Door Stop
(No. 18)
to the bottom left
corner using 3x20mm screws.
Sandwich the Door Styrene
(No. 20)
between
the Door ‘s hole
(No. 7)
and Door Flower
(No. 14)
then fix using 3 x 10mm screws.
Ensure the glazing covers the cut out and
the screws do not crack hit the glazing.
15x20mm screws
3x10mm screws
1x60mm screws
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
9
19
20
22
7
18