background image

P 1

01GRO1008DD-V3

10x8 Groundsman

2mm Drill bit

x2

Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction

All building’s should be 
erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 
heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 
Sutton On Trent, 
Newark, 
Nottinghamshire, 
NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 
manufacturing process to eliminate the 
prospect of splinters on rough surfaces of the 
timber.  You are strongly advised to wear gloves 
when working with or handling rough sawn 
timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 
- When you are ready to start, make sure you have the right tools at hand (not supplied) 
including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 
bit.
- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 
For the duration of heavy or extended periods of rain, swelling of the wood panels may 
occur. Warping of the wood may also occur during excessive dry spells due to an interior 
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 
suggested that the outdoor building is sprayed with water during extended periods of 
warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 
the product during transit and for upto 3 months against mould.  To validate your 
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 
with a wood preserver within the first three months of assembly and thereafter in 
accordance with the manufactures recommendations.  Care must be taken to ensure 
the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 
Ensure that there will be access to all sides for maintenance work and annual 
treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 
diagrams for the base dimensions,  The base should be slightly smaller than the external 
measurement of the building, i.e. The cladding should overlap the base, creating a run 
off for water. It is also recommended that the floor be at least 25mm above the 
surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 
the case of childrens products independently tested to EN71 level, we cannot accept 
responsibility for your safety whilst erecting or using this product.

Refer to the instruction pages for your specific product code

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 
application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 
garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Reviews: