Mercia Garden Products Clover 03CLOV0808-V1 General Instructions Manual Download Page 2

50mm Screw x55 

20mm Screw x24

30mm Screw x136

30mm Chrome Screw x56

Nail Bag

70mm Screw x3

60mm Screw x50

Felt Tacks x250

P 2

03CLOV0808-V1

Overall Dimensions:

Width = 2511mm 

Depth = 2511mm 

Height = 2580mm

Base Dimensions: 

Width = 2350mm 

Depth = 2360mm 

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

PI-04-0023

Finial

Felt

30

Floor Panel

AI-03TAG2360X1175-V1

QTY 2

Back Panel

AI-03CLOVBP0808-V1BP

Window Panel Left

AI-03CLOVWPR2310X2015-V1

Door Panel

AI-03CLOV0808-V1DP

Master Door

AI-03HGMD569X1720-V1

Slave Door

AI-03HGD569X1720-V1

Roof OSB

PI-03-0349

QTY 8

1

2

3

4

5

6

7

9

12

21     

T-Hinge QTY 6

PI-07-0185

23     

Door Handle QTY 2

PI-07-0081

25    

22     

Turn Button QTY 2

PI-07-0034

24     

Press Lock

PI-07-0162

Tower Bolt QTY 6

PI-07-0114

13

14

15

16

17

18

Roof Cap 

SR1295-95mm

Fascia 

S1295-1256mm

 

QTY 8

Eaves Frame  

FS2828-2406mm

 

QTY 4

Cover Trim 

S1240-1997mm

 

QTY 4

Roof Bearer A 

F4444-692mm ANGLED

Roof Bearer B 

F4444-500mm ANGLED

26    

Unequal Hinge QTY 4

PI-07-0184

Window

AI-03FW540X1132-V1

QTY 2

8

19

Window Trim 

S1256-576mm

 

QTY 2

27  

Casement Stay QTY 2

PI-07-0007

28 

29

Fascia Block QTY 20 

F4444-50mm

 

10
11

Roof Frame A 

FS2828-2234mm

 

QTY 4

Roof Frame B 

FS2828-1564mm

 

QTY 8

Roof Frame C 

FS2828-1199mm

 

QTY 8

Roof Block 

F4444-90mm

20     

Window Panel Right

AI-03CLOVWPL2310X2015-V1

Summary of Contents for Clover 03CLOV0808-V1

Page 1: ...an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and...

Page 2: ...Door AI 03HGD569X1720 V1 Roof OSB PI 03 0349 QTY 8 1 2 3 4 5 6 7 9 12 21 T Hinge QTY 6 PI 07 0185 23 Door Handle QTY 2 PI 07 0081 25 22 Turn Button QTY 2 PI 07 0034 24 Press Lock PI 07 0162 Tower Bol...

Page 3: ...m screws through the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 8x50mm Screws Pre drill hole 50mm screw Step 2 Parts needed No 2 QTY 1 No 3 QTY 1...

Page 4: ...g flush to the top and side as shown Please retain product label and instructions for future reference A Step 5 continued Parts needed No 9 QTY 7 No 10 QTY 4 No 11 QTY 7 No 12 QTY 8 Take a second piec...

Page 5: ...e drill hole 60mm screw Step 6 Parts needed No 14 QTY 1 No 20 QTY 1 Fix the Roof Block No 20 to Roof Bearer B No 14 using 2x60mm screws Screw up through the bearer into the block 2x70mm Screws A B A C...

Page 6: ...essary and secure the two bearers together with 1x70mm screw 12x50mm Screws 1x70mm Screws Step 10 Parts needed No 17 QTY 4 Fix each Eaves frame No 17 to the Roof with 3x 30mm screws Align each Eaves f...

Page 7: ...e the previous felt and fix with evenly spaced felt tacks Make sure the felt overlaps by 50mm C Use the off cuts of the previous steps to create 4 small strips for the top of the building D Use the tr...

Page 8: ...Fix the Master Door No 6 to the building Secure the T Hinges No 21 to the Door with 3x30mm screws per hinge Fix the T hinges to the building with 4x30mm screws per hinge 18x30mm Chrome Screws Pre dril...

Page 9: ...e 30mm screw Pre drill hole 30mm screw 18 18 19 18 18 Step 21 Parts needed No 8 QTY 1 No 26 QTY 3 Fix 2 Unequal Hinges No 26 to the Window No 8 using 2x30mm screws per hinge Fix the Window into the op...

Page 10: ...k No 24 to the back of the Master door with 4x30mm screws Making sure to align the key holes Fix the Door handles No 23 to each door on the outside of the building with 2x20mm per handle 12x20mm Screw...

Reviews: