Step 15

Cut the felt into 3 sheets and lay onto

the roof as shown in the illustration

ensuring there is approximately 50mm

of overhang around the building.

Fix onto the building using 75x felt tacks

at 100mm intervals.

175 x Felt Tacks

*Felt size: 2900mm

Please retain product label and instructions for future reference

             

13

13

13

13

16

Step 16

Fix the fascias and finials to the

building using 6x40mm screws

per side, ensuring to screw

through the boards into the 

fascia blocks.

12x40mm Screws

Pre drill 

hole

40mm 

screw

Step 17

Attach the door handles to 

the doors using the 35mm

bolts included with the

door handle.

Pre drill a hole approximately

3mm and fix the handle from 

the inside with the provided

bolts

4x35mm Bolt

Pre drill 

hole

35mm

bolt

23

16

Summary of Contents for BOURNEMOUTH 03BRN0807-V4

Page 1: ...can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm ...

Page 2: ... your building MADE IN GREAT BRITAIN Door Gable Plain Side QTY 2 Plain Gable Floor Roof Sheet QTY 2 Ridge Bar 2067mm Eaves Frame 2750 mm QTY 2 Cover Trim 1682mm QTY 4 Fascia 1192mm QTY 4 Angled Fascia Block 340mm Fascia Block 140mm Finial QTY 2 L Bracket QTY 2 Butt Hinge QTY 6 Turn Button QTY 2 Barrel Bolt QTY 2 Presslock Door Handle QTY 2 Step 1 Place the floor onto a firm and level base Ensure t...

Page 3: ...50mm screws as shown in the illustration making sure the gable sits inside the panel Do not secure the building to the floor until the roof is fitted 9x50mm Screws 10 18 Step 5 Attach the L brackets centrally to the ridge bar using 2x30mm screws per bracket Measure 67mm from each side of the ridge bar and mark with a pencil Align the front edge of the bracket with the pencil mark as shown in the i...

Page 4: ...Place the assembled roof panels onto the building as shown in the illustration Fix into place using 8x30mm screws per side ensuring the roofs are flush with the top of the gables The roof panels should be level with the back of the building leaving an overhang over the front 20x30mm Screws Pre drill hole 30mm screw Step 9 Once the roof is fixed in place secure the building to the floor using 18x50...

Page 5: ... the door gable as shown in the illustration Ensure the veranda floor sits centrally to the building Step 13 Align the veranda sides against the door gable and flush to ends of the veranda floor secure to the building and to veranda floor with 6x50mm screws per side as shown in the illustration 12x50mm Screws Pre drill hole 50mm screw 17 Step 14 Place the veranda frame underneath the roof overhang...

Page 6: ...lease retain product label and instructions for future reference 13 13 13 13 16 Step 16 Fix the fascias and finials to the building using 6x40mm screws per side ensuring to screw through the boards into the fascia blocks 12x40mm Screws Pre drill hole 40mm screw Step 17 Attach the door handles to the doors using the 35mm bolts included with the door handle Pre drill a hole approximately 3mm and fix...

Page 7: ... on glazing and carefuly peel covering back 22 Step 18 Fix the presslock to the inside of the master door making sure to align the barrel and the key hole Secure to the master door with 4x16mm screws Ensure the key turns fully without any restrictions 4x16mm Screws Pre drill hole 16mm screw Step 19 Attach to the barrel bolts to the top and bottom of the slave door using 4x10mm screws per bolt Mark...

Reviews: