background image

Please retain product label and instructions for future reference

             

22b

Step 14 B Continued

(

T&G option only

)

Ensuring the roof boards are flush

at the overhanging side and meet

at the apex, fix the eaves frames 

(No. 21) to the underside of the roof

boards using 9x40mm screws as 

shown in the illustration

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in 

product. Nevertheless the process 

of fixing the eaves frames is the

same.

18x40mm Screws 

40mm 

screw

Pre drill 

hole

Step 15 A (

OSB option only

)

Place the OSB floor sheets (

No. 17a

)

inside the building and fix into 

position using 22x30mm screws 

per floor sheet as shown in the 

illustration.

*Please Note:

 

Ensure to screw 

through the OSB sheets into the

floor bearers.

54x30mm Screws 

30mm 

screw

Pre drill 

hole

Step 15 B (

T&G option only

)

Place the first floor board (

No. 17b

)

inside the building flush to the log

board on one side. Continue adding

the floor boards (

internally

) making

sure to interlock each individual

board.

*Do 

NOT

 secure the boards until

the last board has been measured

and cut.

Following the same method outlined

in 

Step 12 B 

measure the gap between

the bottom of the tongue (

on the last 

board placed

) and the log board.

Using a straight edge mark out the 

measurement onto the last floor

board (

No. 17b

) and cut along the 

length removing the excess.

**Please note:

 Mark the final board

2mm under the measurement; This

will allow the timber to expand and

contract correctly.

Once all the floor boards are in 

position secure each board into

position using 9x40mm screws.

***Please Note:

 

Ensure to screw 

through eachof the floor boards 

into the floor bearers.

153x40mm Screws 

40mm 

screw

Pre drill 

hole

*

Cut to fit

15

17a

17b

Summary of Contents for 06LOG001-V1

Page 1: ...is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Our buildings are pre treated with a water based treatment this only helps to prot...

Page 2: ...ng MADE IN GREAT BRITAIN Window QTY 2 Door Cabin No 10 Gable 2500mm QTY 2 Starter Board S1 66x19x2500mm QTY 2 LB19RT66 2500mm Log Board B 120x19x1370mm QTY 6 LB19 1370mm Log Board B 120x19x310mm QTY 3...

Page 3: ...w No 11 and the casement stay pins to the window cill using 6x30mm screws per casement stay Ensure the casement stay is centralised on the window 6x30mm Black Screws 6x30mm Screws Depending on Ironmon...

Page 4: ...outlined in Pre Assembly lay the first 6 boards No s 5 6 8 9 onto the starter boards to create your first level Ensure that the boards are level and flush with each other as you lay each one Fix every...

Page 5: ...re level with each end Please note This image is for illustrative purposes and may differ from your choice in product regarding window position Nevertheless the process of fitting the window is the sa...

Page 6: ...x70mm Screws 70mm screw Step 11 See Pre Assembly Following the same method outlined in Pre Assembly lay the last two boards No 10 onto the front of the assembly Once in position place log board AR No...

Page 7: ...e boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Ensure the roof boards meet at the top of the apex and leave an overhang at the bottom Continue...

Page 8: ...x30mm Screws 30mm screw Pre drill hole Step 15 B T G option only Place the first floor board No 17b inside the building flush to the log board on one side Continue adding the floor boards internally m...

Page 9: ...st the boarding and align with the roof as shown in the illustration ensuring the angled face follows the roof line Once in position fix each roof trim into place using 6x40mm screws per light block e...

Page 10: ...st point possible on each side Storm braces will help your building expand and contract properly It is imperative that each bolt is tightened using a washer so as not to damage the log boards 16x80mm...

Reviews: