
Please retain product label and instructions for future reference
19
18
18
18
18
19
19
19
P 11
19
Step 18
Parts needed - No. 18 QTY 4
No. 19 QTY 4
Align the fascia’s (
No’s. 18 &
19
) with the roof and fix into
place using 3x40mm screws
per fascia, making sure to
screw through the fascia into
the roof purlins and eaves
frames.
24x40mm Screws
Pre drill
hole
40mm
screw
70mm
bolt
Step 19
Parts needed - No. 20 QTY 8
Arrange the storm braces (
No. 20
)
around the building (
internally
).
Place 2x storm braces per side
fixing into place using 2x 70mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***Important: Ensure each
bolt is tightened using a
washer so as not to damage
the log boards.
16x70mm Bolt Sets
Pre drill
hole
20
20