Step 4
(See Pre-Assembly)
Parts needed - No. 5 QTY 6
No. 7 QTY 8
No. 10 QTY 4
Following the same method
outlined in
Pre-Assembly
, lay the
first 6 boards (
No’s. 5, 7 & 10
)
onto the starter boards to
create your first level.
*Ensure that the boards are
level and flush with each other
as you lay each one.
IMPORTANT:
Pre-drill before fixing screws.
P 5
Please retain product label and instructions for future reference
4
5
4
4
5
7
7
5
5
10
Pre drill
hole
70mm
screw
Step 3
(See Pre-Assembly)
Parts needed - No. 4 QTY 2
No. 5 QTY 2
Place the boards (
No’s. 4 & 5
)
on to the assembled base
frame along the longest
sides.
*Ensure the notches at either
end of each board are flush
and level with the ends of the
frame.
Fix each of the starter boards to
the frame by screwing through
the notch into the frame as
shown in the illustration.
4x70mm Screws
IMPORTANT:
Pre-drill before fixing screws.
Step 5
(See Pre-Assembly)
Parts needed - No. 8 QTY 12
No. 9 QTY 12
No. 10 QTY 6
No. 12 QTY 12
No.13 QTY 12
Following the same method
outlined in
Pre-Assembly
, lay
the next 6 boards (
No’s. 8, 9,
10, 12 & 13
) onto the
assembly to create your
second level.
*Ensure that the boards are
level and flush with each
other as you lay each one.
*Doors can be hung once the
boarding has enclosed the
door frame by 12-13 boards,
refer to door installation
instructions, if not, you can
install the door at step 7.
***Please Note:
The short boards placed
to create the opening’s for the doors &
windows can be placed either side
depending on your needs.
10
9
9
13
12
8
13
12
8