background image

Please retain product label and instructions for future reference

             

70mm 

screw

Pre drill 

hole

40mm 

screw

8

2

4

Step 2

Parts Needed - No. 4 QTY 2

                                 No. 8 QTY 2

Following the method outlined

in the illustration, secure one  

starter board (No. 4) onto each of 

the small bearers 

(No. 2),

 using 

1x70mm screws per board, 

ensuring to screw through the    

notch into the bearer below. 

 

 

Make sure that the end of starter 

board  (

No. 4

) is flush with end  of  

the small bearer (

No. 2.

)

Place the first two log boards 

(No.8) onto the starter boards 

(No.4) and rest onto the bearers as 

shown in the illustration.

Once in position fix the log board 

to the inside of the cabin using 

2x40mm screws per log board.

*The centre bearer at this 

point is not fixed into position,

arrange so that the bearer is

central.

4x40mm Screws

2x70mm Screws

P 4

4

8

4

8

.

8

7

5

5

5

6

Step 3

Parts Needed - No. 5 QTY 18

                                 No. 6 QTY 2

                                 No. 7 QTY 6

                                 No. 8 QTY 6 

Following the method outlined

in the illutration, continue placing 

the boards (No. 5, 7 & 8) on to the 

veranda sides as shown in the illus-

trations, ensuring to interlock the 

boards.

Once in position fix the top log 

board 

(No.6) 

on each side to the 

inside of the cabin using 2x40mm 

screws per log board. 

4x40mm Screws

Pre drill 

hole

40mm 

screw

6

5

5

8

8

8

7

7

Rubber Mallet 

may be required 

to fit parts.

6

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Summary of Contents for 0619VR3301-V1

Page 1: ...ltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60mm to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer to diagrams for the base dimensions The base should be slightly smaller than the extern...

Page 2: ... Log Board 120x19x326mm QTY 6 LB19 C 326 Log Board 120x19x1000mm QTY 8 LB19 B 1000 Log Board 56x19x1000mm QTY 2 LB19RG56 B 1000 2 1 Bearer 44x44x247mm QTY 2 F4444 247 PT Floor Board 120x12x882mm QTY 25 S12120 882 Starter Board 66x19x326mm QTY 2 LB19RT66 B 326 Log Board 120x19x326mm QTY 18 LB19 B 326 EXAMPLE BUILDING There may be extra screws present in the nail bag 70mm Screw x 12 Nail Bag 40mm Sc...

Page 3: ...Log cabin should be fully assembled before starting the Veranda Your building should look as shown Step 1 Parts Needed No 1 QTY 3 No 2 QTY 2 Place the first Bearer No 1 up to the log cabin and fix to the log cabin bearer using 4x70mm screws Attach one small bearer No 2 to each end of the third larger bearer using 4x70mm screws 8x70mm Screws a b Pre drill hole 70mm screw a 1 1 2 b 1 2 ...

Page 4: ... as shown in the illustration Once in position fix the log board to the inside of the cabin using 2x40mm screws per log board The centre bearer at this point is not fixed into position arrange so that the bearer is central 4x40mm Screws 2x70mm Screws P 4 4 8 4 8 8 7 5 5 5 6 Step 3 Parts Needed No 5 QTY 18 No 6 QTY 2 No 7 QTY 6 No 8 QTY 6 Following the method outlined in the illutration continue pl...

Page 5: ...he veranda sides using 1x70mm screws per board through the notches and 2x40mm screws per board through the boards as shown in the illustration 2x40mm Screws 2x70mm Screws 70mm screw Pre drill hole 40mm screw 9 9 9 Rubber Mallet may be required to fit parts AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back It is ESSENTIAL that you apply wood treatment immediat...

Reviews: