P 8
Please retain product label and instructions for future reference
Step 16
Fix the Casement stay
(No. 19)
to the
opening window then align the fixings
onto the window panel frame. Ensure the
casement stay fits onto fixings when
closed before screwing them down using
6x20mm screws.
6x20mm Screws.
Pre drill
hole
20mm
screw
6x20mm screws per casement stay
19
Step 15
Place the Roof panels
(No. 6)
&
(No. 7)
on
top of each gable, making sure the roofs
are flush to each gable and meet at the
top of the apex.
Secure each roof panel to the building
using 16x50mm screws.
16x50mm Screws.
*IMPORTANT:
Ensure both roof
sections meet at the top of the
apex as shown in the illustration.
Pre drill
hole
50mm
screw
*
6
7
Step 14
Repeat step 12 for part 7.
12x30mm Screws.