P 9
Please retain product label and instructions for future reference
Step 19
Fix 3 Hinges
(No. 23)
to each Door
(No.9 & No.10)
securing with 4x30mm
black screws per hinge. Position as
shown.
Fix each Door to the building with
4x30mm black screws per hinge.
48x30mm black screws.
Pre drill
hole
30mm
screw
23
9
10
Step 20
Fix the Fascias
(No. 13)
to the
building with 3x30mm screws
per Fascia.
12x30mm screws.
Pre drill
hole
30mm
screw
13
13
13
13
Step 21
Fix the Finials
(No. 26)
to the
building with 2x30mm screws
per Finial.
4x30mm screws.
Pre drill
hole
30mm
screw
26
26
Step 22
Fix a Ring Pull
(No. 22)
to each
door with 4x20mm black screws
per Finial.
8x20mm black screws.
Pre drill
hole
20mm
screw
22
22