P 5
Please retain product label and instructions for future reference
Step 6
9x50mm Screws
Fix the corners with 50mm
screws as shown in diagram.
Pre drill
hole
50mm
screw
1
4
Step 7
20x50mm Screws
Locate the roof panels on top of
the building, allowing 50mm
overhang to the rear.
Secure the panels in place
using 50mm screws through
the roof panels into the gable
blocks and into the side panels.
Pre drill
hole
50mm
screw
7
7
Step 8
16x50mm Screws
Once the roof is fixed attach
the building to the floor with
50 mm screws ensuring that
the screws go through to the
floor bearers.
b
Pre drill
hole
50mm
screw
Step 9
Place the Veranda floor central
to the front of the building
and fix in place with 50mm
screws.
Pre drill
hole
50mm
screw
6
4x50mm Screws