
P 3
Please retain product label and instructions for future reference
Step 2
Fix the master and slave door to
the attached side doors with
8x butt hinges, using 6x25mm
screws per hinge.
*Ensure the doors open freely,
folding back into the building
unrestricted.
48x25mm Screws
Pre drill
hole
25mm
screw
35mm
bolt
25
23
Step 3
Secure the barrel bolts to the top &
bottom of each side door and the
slave door using 6x10mm screws.
Attach the press lock to the master
door with 4x25mm screws, aligning
the barrel with the key hole.
*Ensure the key turns
and locks properly before fixing to
the door.
Fix the door handles to the outside
of the master and slave door using
the 35mm bolts provided.
36x10mm Screws
4x25mm Screws
4x35mm Bolts
Pre drill
hole
10mm
screw
25mm
screw
24
Step 4
Place the floor panels upside down onto
a firm and level base. Ensure the base has
suitable drainage, free from areas where
standing water can collect.
Secure the floors together using 8x50mm
screws through the floor bearers in an
alternating pattern.
Once fixed together turn the floor back
the right way up.
8x50mm Screws
7
7
Pre drill
hole
50mm
screw
Step 5
Fix the corners with 50mm
screws as shown in the
illustration.
Do
not
secure the building
to the floor until the roof
is fitted.
3x50mm Screws
Pre drill
hole
50mm
screw
5
3
9
10
20
20
20
20
20
20
20
20