background image

03TGCOR0707-V4

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

7x7 T&G Corner Summerhouse

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(not supplied) including  a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the 
highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot 
accept responsibility for your safety whilst erecting or 
using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

**Protim Fentex E5**

Biocidal Product Regulation (EU 528/2012) Article 58 Information

Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products. 

Wood correctly preserved with Protim Fentex E2 is protected against mould in storage. 

Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

Refer to the instructions pages for you specific product code

Summary of Contents for 03TGCOR0707-V4

Page 1: ...Care must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the building and base is going to be constructed Ensure that there will be access to all...

Page 2: ...x16 40mm Screw x68 Felt Tacks x80 10mm Screw x9 16mm Black Screw x8 35mm Coach Screw x4 25mm Screw x38 25 Rain Guard 710mm QTY 2 Rear Cover Trim 1800mm QTY 2 26 P 2 03TGCOR0707 V4 Overall Dimensions...

Page 3: ...4x16mm Black Screws 8x10mm Screws 10mm screw Pre drill hole 16mm screw Drill a hole in the framing above and below the door for the tower bolt to fix into Pre drill holes then fix Chrome Handle using...

Page 4: ...panel joint into place with 3x50mm screws 6x50mm Screws 50mm screw Pre drill hole Step 4 Using the same method outlined in Step 3 place the rear panel right against the floor and window panel securing...

Page 5: ...Place the roof section on top of the building ensure the roof framing slots over each side Fix the roof panel into position using 40mm screws making sure to line the screws with the framing inside th...

Page 6: ...a guide Fix roof to building as shown in step 7 then place sheets back into position in diagram with 50mm over hang all around fix each sheet using felt tacks along where the sheets overlap 80x Felt...

Page 7: ...rd 6x60mm Screws 60mm screw Pre drill hole Step 15 Fix the rear cover trimsto the back of the building aligning with the edge of the panel 6x40mm Screws 40mm screw Pre drill hole 26 26 It is ESSENTIAL...

Reviews: