Mercia Garden Products 03OVLPBRN0705-V2 Instructions Manual Download Page 2

35mm Bolt x x4

Nail Bag

50mm Screw x 32

40mm Screw x 22

Felt Tacks x 75

30mm Screw x 34

10mm Screw x 14

25mm Black Screw x 7

25mm Screw  x 36

Remove transportation blocks 

from the bottom of each panel 

before beginning assembly. 

Each panel should have two 

blocks.

Step 1

Place the floor on a firm and 
level base, ensure the base has 
suitable drainage free from areas 
where standing water can 
collect.  (See front page on base 
requirements).  

Step 2

4

Fix the Butt Hinges to the Door Gable 

using 30mm screws ensuring that the 

screws go through to the framing.

Step 3

36x 25mm Screws

1

14

5

6

30mm 

screw

Step 4

Fix the corners with 50mm 
screws as shown in diagram.

Position the panels so there is equal spacing 
between the floor and cladding on all 4 sides

3 x 50mm Screws

2

3

50mm 

screw

Reviews: