16
15
16
15
16
15
16
30mm
screw
Pre drill
hole
30mm
screw
Pre drill
hole
Step 13
To secure the roof felt in place,
sandwich the felt between the
top and bottom roof trims as
shown in the illustration, fixing
into place using 24x30mm
screws.
24x30mm Screws
30mm
screw
Pre drill
hole
Step 14
Fix the fascias to the front of the building
securing each board to the roof framing
using 8x40mm screws.
Place the finial over the fascia joint and
fix into place with 2x40mm screws.
10x40mm Screws
40mm
screw
Pre drill
hole
Sla
ve D
oor
Lock
ing D
oor
18
18
21
17
21
17
17
Please retain product label and instructions for future reference
Step 15
Fix the cover trims around the
building across the joints on
each panel and at the corners
using 3x30mm screws per trim.
21x30mm Screws
Step 16
Attach the turn buttons to the top
& bottom of the slave door using
2x30mm black screws.
*These turn buttons help to keep
your doors straight during high
and low levels of moisture
content in the air.
2x30mm Black Screws
36
14
28
14