
Please retain product label and instructions for future reference
P 8
It is ESSENTIAL that you apply wood treat-
ment immediately after the building has
been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Step 19
Parts needed - No. 17 QTY 2
- No. 24 QTY 2
Fit the Cover Trims
(No.17)
to the back
of the building onto the joins of the
panels, secure using 3x30mm screws
per cover trim.
Fix the rear cover trims
(No.24)
to the
back of the building, aligning with
the edge of the panel.
12x30mm Screws
30mm
screw
Pre drill
hole
24
24
17
17
Step 20
Parts needed - No. 20 QTY 4
No. 21 QTY 3
Fit the fascias
(No.20 and No.21)
to the building over the felt and
secure in place with 3x40mm
screws per cover trim.
Make sure the fascias at the back
of the building fit lower than the
roof height to allow water to run
off.
21x40mm Screws
40mm
screw
Pre drill
hole
20
20
20
20
21
21
21
Summary of Contents for 03DTSHCR0808FGD2TW-V1
Page 9: ...2 1 3 4...
Page 10: ...1 2...