background image

P 6

Please retain product label and instructions for future reference

             

Step 12

Secure the building to the floor . Fix the 

panels onto the floor using 50mm 

screws in alignment with the floor joists

*Ensure to screw through the framing 

into the floor bearers.

20x50mm Screws

50mm 

screw

Pre drill 

hole

Step 15

Parts needed - No.34 QTY 2

 

 

   No.35 QTY 1

b

b

b

b

b

b

b

b

b

b

b

b

35mm

bolt

34

36

Pre drill 

hole

10mm 

screw

25mm 

screw

35

Fix the door handles

 (No.36)

 to the 

outside of the master and secondary door 

using the 35mm bolts provided.

Fix the Turn buttons 

(No.30)

 at the top and 

bottom of the Master door using 2x30mm 

screws.

2x30mm Screws

4x35mm Bolts

Step 14

Parts needed - No. 30 QTY 2 

 

 

- No. 36 QTY 2  

36

Secure the barrel bolts

 (No.34)

 to the top 

& bottom of the secondary door using 

6x10mm screws.

Attach the press lock 

(No35) 

to the master 

door with 4x25mm screws, aligning the 

barrell with the key hole. 

*Ensure the key turns and locks properly 

before fixing to the door.

12x10mm Screws

4x25mm Screws

Pre drill 

hole

INTERIOR

EXTERIOR

MASTER DOOR

MASTER DOOR

SECONDARY DOOR

SECONDARY DOOR

10mm 

screw

30

30

30

36

INTERIOR

Step 13

Parts needed - No.15 QTY 1

 

 

- No.16 QTY 2 

Fit the Door Strip 

(No.15 and 

No.16) 

to the framing of the door

panel, secure using 3x30mm screws 

per strip 

9x30mm Screws

30mm 

screw

Pre drill 

hole

15

16

16

Summary of Contents for 03DTSHCR0707FGD2TW-V1

Page 1: ...prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of heavy or extended periods of rain swe...

Page 2: ...60x1800mm QTY 2 S1260 1800mm 33 Locating Block 28x28x240mm QTY 2 FS2828 240mm 32 36 34 3 Large Right Panel QTY 1 AI 01S11SHPGR952X1947 V1 4 Small Right Panel QTY 1 AI 01S11SHPGR980X1897 V1 5 Large Lef...

Page 3: ...re the inner door framing is the correct way round as shown in the illustration 36x25mm Screws Pre drill hole 30mm screw 1 33 33 33 33 33 33 33 12 11 Step 2 Parts needed No 3 QTY 1 No 4 QTY 1 No 5 QTY...

Page 4: ...Frame No 19 into place with 3x50mm screws Do not secure the building to the floor until the roof is fitted 6x50mm Screws 50mm screw Pre drill hole a a a 19 6 5 a Step 6 Parts needed No 3 QTY 1 No 4 Q...

Page 5: ...sections No 9 and No 10 on top of building ensure roof framing slots over each side equally all the way around Fix Roof Panels into position using 50mm screws ensuring that they line up with the verti...

Page 6: ...30 at the top and bottom of the Master door using 2x30mm screws 2x30mm Screws 4x35mm Bolts Step 14 Parts needed No 30 QTY 2 No 36 QTY 2 36 Secure the barrel bolts No 34 to the top bottom of the secon...

Page 7: ...ascia width as a cutting guide Cut the triangle with 50mm overhang again using fascia as a guide 100x Felt Tacks HANDLE WITH CARE 1 2 3 4 1 2 50mm 50mm 50mm 3 0 2 0 m m 1 0 0 0 m m 1 4 2 0 m m 5 0 m m...

Page 8: ...over the felt and secure in place with 3x40mm screws per cover trim Make sure the fascias at the back of the building fit lower than the roof height to allow water to run off 15x40mm Screws 40mm screw...

Page 9: ...2 1 3 4...

Page 10: ...1 2...

Reviews: