Mercia Garden Products 02HON51156-V1 Manual Download Page 3

Step 2

11 x 50mm screws

2

5

 

Fix the corners with 2 x 50mm  

 

screws as shown in diagram.

 

Do not secure the building to the  

 

floor until the roof is fitted. Fix  

 

the panels onto the floor using  

 

50mm screws in alignment with  

 

the floor joists.

50mm 

screw

1

4

*Before fixing the door gable, check 

the top and bottom of the door and 

remove any transit screws . Make sure 

door opens and closes freely. Adjust 

hinge position if necessary.

Step 3

Fix door gable and Plain sides 

using same method shown in 

step 2.

Position the panels so there is 

equal spacing between the floor 

and cladding on all four sides.

17 x 50mm screws

8 x 30mm screws

9

20

30mm 

screw

Place the roof support bar in 

between the front and back panels. 

Ensure the top corners of the 

support bar are flush with each top 

point. Secure in place using the L 

Bracket on each end with 4x30mm 

screws.

Step 4

40mm 

screw

30mm 

screw

6 x 30mm screws

24 x 40mm screws

8

3

Step 5

Fix an eaves frames to each 

sheet using 3x30mm screws 

per eave.

Fix the roof sheets to the roof 

using 40mm screws directly 

through the OSB into the 

framing.

Reviews: