background image

Step 17

Parts needed -             &

The safety boards 

(No.11 & 12)

 are 

positioned to block the gaps on the tower’s 

rails and stop entrapment when going 

down the slide. Fix them in place using 

4x30mm screws per board.

8 x 30mm screws

30mm 

screw

11

12

1!

Pre drill 

hole

4!

12

11

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Playhouse Maintenance:

It is recommended that the following checks and maintenance are carried out at the beginning 

of each season as well as at regular intervals during the usage season.

- Check all nuts /bolts/ screws for tightness and tighten when required.

- Check for movement / opening of wood giving rise to protrusion of nail heads and tips.

- Check hinges.

- Replace defective parts in accordance with the manufacturers instructions. 

- Check any crossbeams, suspensions and anchors.

- If a swing is included; check the swing seat, chains and ropes.

IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD

P11

Please retain product label and instructions for future reference

       

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      

2!

50kg

 

Summary of Contents for 02DTTWR6565-V1-PEFC

Page 1: ...trichlorophenol BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY Check the pack and make sure you have all the parts listed in the parts list provided When you are ready to start make sure you...

Page 2: ...er Slide SI 002 001 0024 5x5 Playhouse With Framed Door Tower Slide Swing SI 002 001 0025 02DTSHAX05051W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 02PATINCSWA V1 PEFC Swing Set 02DTSHAX05051W V1 PEF...

Page 3: ...ming 100x100x555mm QTY 1 F100100 555mm 12 13 14 11 Small Rail QTY 1 AI 02TCR416X543 V1 Part not required if purchased slide Platform QTY 1 AI 02TB1470X1983 V1 Large Rail QTY 1 AI 02CR1331X543 V1 Ladde...

Page 4: ...e blocks as to not damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE Please retain product...

Page 5: ...8 7 1 1 2 Pre drill hole Step 3 Parts needed Measure the distance from the edge of the corner brace No 7 up to the post from both ends both measurments should be the same Make a note of the exact mea...

Page 6: ...e 9 Step 7 Parts needed With some help tip the platform No 1 round to the other side Place the remaining front post No 9 within the cut out on the platfrom make sure the pencil mark lines up with the...

Page 7: ...u can now continue to finish the tower This particular playhouse has been used for illusrtation purposes Step 10 Parts needed Place the large rail No 2 between the two front posts No 9 ensuring the fr...

Page 8: ...block will be fixed wth 2x60mm screws 2x60mm screws 60mm screw 10 10 Step 13 Part Needed Place the ladder between the front post No 9 and the playhouse left hand side rail Ensure the ladder fits flus...

Page 9: ...ach the slide framing No 13 to the side of the platform with 3x100mm screws level with the top of the platform 3 x 100mm screws 100mm screw Note We recommend applying an impact reducing surface around...

Page 10: ...required distance between the product and eventual obstacles walls fencing The distance should be minimum 2000mm 8 In this safety area no hard angular or pointed objects should be present The surface...

Page 11: ...enance are carried out at the beginning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tighten when required Check for movement op...

Page 12: ...2 1 3 4...

Page 13: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: