Step 8
The playhouse can now be assembled
on top of the framing.
Follow the instructions provided with
the playhouse to do this.
*Disregard the floor joists as these are not
needed when fitting to the platform.
Secure the playhouse to the framing
with 8x50mm screws.
8x50mm screws
50mm
screw
1!
2!
Pre drill
hole
50kg
Step 9
Parts needed - &
Slot the Shiplap Boards (
No. 10 &
11
) into the bottom of the cladding
around the sides.
Fix them into position by screwing
through the face of the board into
the framing below using 4x40mm
screws per board.
12x40mm screws
11
40mm
screw
11
10
10
11
1!
2!
Pre drill
hole
50kg
10
11
P7
Please retain product label and instructions for future reference
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
Please retain product label and instructions for future reference