background image

Please retain product label and instructions for future reference

            

Step 1

Parts needed -            &            &        

            Fix the Window Blocks (

No. 20

) to either side of the 

Windows (

No. 8

) as shown using 1x30mm screw.

           Place one Window (

No. 8

) into each  window hole in 

the Door Gable 

(No.1)

, fix by screwing though the Window 

Block (

No. 20

) with 2x30mm screws per window block as 

shown.  

12x30mm screws. 

30mm 

screw

8

A

B

1!

2!

Pre drill 

hole

20

20

1

A

B

1

20

8

8

20

20

20

Step 2

Parts needed -            

 

If purchased with a tower please 

read both sets of instructions before 

beginning assembly.

Place the Floor 

(No.4) 

on your firm and 

level base, ensure base has suitable 

drainage free from areas where 

standing water can collect. (See front 

page on base requirements).

**Please note: if you have purchased a 

Tower 

(02DTTWR0707-V1-PEFC)

please construct your playhouse onto 

the Tower base rather than the Floor.

4

1!

2!

Pre drill 

hole

 

4

Please retain product label and instructions for future reference

             

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P5

Summary of Contents for 02DTSHAX0606SFHD2W-V1-PEFC

Page 1: ...4 6 trichlorophenol BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY Check the pack and make sure you have all the parts listed in the parts list provided When you are ready to start make sure...

Page 2: ...house SI 002 001 0011 6x6 Playhouse Tower SI 002 001 0041 6x6 Playhouse Tower Slide SI 002 001 0042 6x6 Playhouse Tower Slide Swing SI 002 001 0105 Model Build Instructions Required 02DTSHAX0606SFD2W...

Page 3: ...V1 Roof QTY 2 AI S11MBOHAR1075X1682 V1 Floor QTY 1 AI S11MBF1760X1165 V1 Left Side Panel QTY 1 AI 02S11PPVRL1670X1184 V1 Right Side Panel QTY 1 AI 02S11PPVRR1670X1184 V1 Door QTY 1 AI 02SFHD594X1060...

Page 4: ...blocks as to not damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed If purchased with a tower please read both sets of instructions before beginning as...

Page 5: ...0 Step 2 Parts needed If purchased with a tower please read both sets of instructions before beginning assembly Place the Floor No 4 on your firm and level base ensure base has suitable drainage free...

Page 6: ...nd the Right Side Panel No 6 on top of the floor ensuring the panels are positioned centrally on the floor as shown in the illustration Fix together by screwing through the framing of the Plain Gable...

Page 7: ...erhang the front of the building by 475mm Make sure the 16mm overhang on the roof panel is at the apex of the building Secure by screwing through the roof panel No 3 into the gables and panel below us...

Page 8: ...re drill hole 11 11 Step 11 Parts needed Cut the Felt No 21 into 3 sheets of 1785mm L x 1000mm W and lay onto roof Start at the bottom of the roof and work your way up so that rain pours over the top...

Page 9: ...o 17 onto the outside of the door Fix in place by hand screwing through the door with the screw attached to the door handle Sandwich the Door Styrene No 16 between the door cut out and Door Flower No...

Page 10: ...ts bolts screws for tightness and tighten when required Check for movement opening of wood giving rise to protrusion of nail heads and tips Check hinges Replace defective parts in accordance with the...

Page 11: ...2 1 3 4...

Page 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: