![Mercia Garden Products 02CORPLAY0505-V1-PEFC General Instructions Manual Download Page 5](http://html1.mh-extra.com/html/mercia-garden-products/02corplay0505-v1-pefc/02corplay0505-v1-pefc_general-instructions-manual_1772706005.webp)
5
4
3
1
2
2
Step 8
Parts needed - &
Fix the 2x “L” brackets
(No.19)
to
either end of the ridge bar
(No.17)
using
2x20mm screws per bracket.
*Ensure the bracket plate(
s
) are flush
with each end of the ridge bar.
Once in place position the ridge bar
between the gable and window
panel, securing into position using
2x30mm screws per side.
4x20mm Screws
4x30mm Screws
20mm
screw
30mm
screw
b
4
Step 5
Parts Needed - &
Place the left and right gable(
s
)
(
No’s. 3 & 4
) onto the floor (No.8) and
fix together using 3x50mm
screws. Ensure to secure through
the right gable into the panel
frame.
Do NOT secure the building to
the floor until after the roof has
been fitted.
3x50mm Screws
50mm
screw
Please retain product label and instructions for future reference
Step 7
Parts needed - &
Following the same method
outlined in
Step 4
fix the
second window panel (
No. 2
)
and door panel (
No. 1
) into
position, securing at the
corner(
s
) with 3x50mm screws.
Do
NOT
secure the building to
the floor until after the roof has
been fitted.
9x50mm Screws
50mm
screw
2
1
2
Step 6
Parts needed -
Following the same method
outlined in
Step 4
fix the first
window panel (
No. 2
) into
position, securing at the
corner with 3x50mm screws.
Do
NOT
secure the building to
the floor until after the roof has
been fitted.
3x50mm Screws
50mm
screw
a
17
19
b
a
19
17
www.merciagardenproducts.co.uk P5
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
1!
2!
Pre drill
hole
1!
2!
Pre drill
hole
1!
2!
Pre drill
hole
1!
2!
Pre drill
hole
3