Mercia Garden Products 02CHYTWR-V2 Instructions Download Page 2

STEP 3

Bunk Rail

100mm 

screw

4 X 100MM SCREWS

Lift the frame up and position 

the leg posts (6) as shown. 

Fix the posts to the frame using 

100mm screws. Pre-drill holes 

first.

6

6

6

6

STEP 4

Place the components as shown 

and fix together using 100mm 

screws. Pre-drill holes first to 

avoid splitting the wood.

16 X 100MM SCREWS

7

Fix a brace (7) to either side of 

each leg post using 100mm 

screws as shown. Pre-drill holes 

STEP 1

STEP 2

4

3

3

2 X 100MM SCREWS

5

4

4 X 100MM SCREWS

100mm 

screw

Place the next set of 

components inside the frame  

make sure component 5 is 

postioned in the center and use 

component 5 as a guide for 

positioning component 4 in the 

middle. 

Fix together using 100mm 

screws. Pre-drill holes first.

100mm 

screw

4

Summary of Contents for 02CHYTWR-V2

Page 1: ...ately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Though this building is supplied pre painted it is recommended to treat the building annually using wood paint or preserveative which there are a variety of of colours and stains avai...

Page 2: ...l holes first to avoid splitting the wood 16 X 100MM SCREWS 7 Fix a brace 7 to either side of each leg post using 100mm screws as shown Pre drill holes STEP 1 STEP 2 4 3 3 2 X 100MM SCREWS 5 4 4 X 100MM SCREWS 100mm screw Place the next set of components inside the frame make sure component 5 is postioned in the center and use component 5 as a guide for positioning component 4 in the middle Fix to...

Page 3: ...mm screw 12 X 50MM SCREWS 8 9 8 9 Now Place the framing on top of the floor sheet around the edge as shown Fix each piece place into place using 3x50mm screws per piece Predrill holes first to avoid splitting the wood STEP 8 The platform is ready for the assembly of the playhouse on top Follow the instructions provided with the playhouse Disregard the floor joists as these are not needed when fitt...

Page 4: ... as shown and fix into position using 100mm screws Pre drill holes first and ensure the screws go straight through into the platform framing The Ladder can also be positioned at the front see step 12 8 X 50MM SCREWS 50mm screw 12 14 13 Next assemble the ladder using the components shown and finxing with 50mm screws Pre drill holes first 2 X 100MM SCREWS 100mm screw 10 11 10 11 40mm screw 40mm scre...

Page 5: ...an be reversed to create an alternative set up if desired We adivse not to place either the ladder or slide on the same side as the door as this creates a potential hazard x We adivse not to place either the ladder or slide on the same side as the door as this creates a potential hazard Score around protective cover on glazing and carefully peel covering back using a utility knife score around pro...

Reviews: