Mercia Garden Products 02CHY0404-V6-PEFC Instruction Manual Download Page 1

www.merciagardenproducts.co.uk      P1

2mm Drill bit

12mm CSK

02CHY0404-V6-PEFC

Cherry Playhouse

In all instances for assistance with your product, please contact customer care on :  

01636 880514 or [email protected]

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

Please retain product label and instructions for future reference

        

General Instructions

BEFORE YOU START PLEASE THE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed in the parts list provided. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a 

Phillips screwdriver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and 

a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

- Ensure you have enough time to build the product to ensure the building is water tight.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration 

of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may 

also occur during excessive dry spells due natural processes. Unfortunately, these processes cannot be 

avoided but can be helped. It is suggested that the outdoor building is sprayed with water during 

extended periods of hot weather and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to prevent discolouration 

whilst in stock.  To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a suitable preservative in accordance with the manufacturers recommendations.  

Care must be taken to ensure the product is placed on a suitable base.

We recommended using a suitable protection for your playhouse. As the product is destined for use by 

children, a water based treatment that is 

EN71 tested

 for children is ESSENTIAL.

We also recommend treating the building prior to construction.

POSITIONING YOUR PLAYHOUSE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment. 

We recommend a 

minimum space of 2m around a playhouse

, away from any structure or obstructions 

such as fences, garages, houses, overhanging branches, washing lines or electrical wires.

It is recommended that the position of the Playhouse, Slide and Swing is

 not in direct sunlight.

Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or 

any hard surface.

BUILDING A BASE 

Ensure the base is level and is built on firm ground, to prevent distortion, checking with a spirit level.  

Refer to diagrams for the base dimensions.  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is 

also recommended that the floor be at least 25mm above the surrounding ground level to avoid 

flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

- Wooden base.

CAUTION 

Wood is a natural product and can change post manufacture. So despite every effort being 

made to ensure the material used are cut and machined to a clean and smooth finish, care 

must be taken when handling the product and preparing for use by your child.

Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a 

smoother finish. Alternatively, call the customer service department who will be happy to 
arrange replacement panels/parts.

 

WARNING 

 ONLY SUITABLE FOR DOMESTIC USE.

• 

TO BE USED UNDER DIRECT SUPERVISION OF AN ADULT.

 THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY. ANY MODIFICATIONS SHOULD BE 

DETERMINED BY THE MANUFACTURER AND CARRIED OUT ACCORDING TO  THE INSTRUCTIONS.

• 

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY.

 MAX AGE OF 14 YEARS.

• 

THIS TOY IS FOR OUTDOOR USE ONLY.

• 

USE A WATER BASED TREATMENT THAT IS EN71 TESTED 

!

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products 

independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be erected by 

atleast two adults.

DO NOT ALLOW 

CHILDREN TO ASSIST.

To prevent damage during 

assembly, you 

MUST

 pilot 

drill all screw holes and 

ensure all screw heads are 

countersunk

.

For ease of assembly, you will 

need a tape measure to check 

dimensions of components.

**Protim Aquatan T

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of 

Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and 

alcohols: 2, 4, 6-trichlorophenol.

WARNING: Only for domestic use

Not suitable for children under 36 months due to 

small parts and danger of falling from heights.

To be used under direct supervision of an adult

Summary of Contents for 02CHY0404-V6-PEFC

Page 1: ...ers shall not be installed over concrete asphalt or any hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller than the external measurement of the building i e The cladding should overlap the base creating a run off for water It is also recomm...

Page 2: ...de 12mm gap surrounding the door 2 3 50kg 50kg per user 13 14 19 16 Finial QTY 2 SHED DIAMOND FINIAL 15 18 17 20 2 1 3 Door Gable QTY 1 Plain Gable QTY 1 Plain Side QTY 2 AI 02CHY0404DG1200X1336 V5 AI 02CHY0404PS1112X979 V1 8 9 10 11 12 Ridge Bar 28x28x1054mm QTY 1 Eaves Frame 28x28x1205mm QTY 2 Floor Joist 28x28x1110mm QTY 4 Fascia 95x12x800mm QTY 4 Fascia Block 28x28x200mm QTY 1 FS2828 1054mm FS...

Page 3: ...3 30mm Screw x 44 50mm Screw x 24 60mm Screw x 1 20mm Screw x 4 40mm Screw x 32 Felt Tacks x 60 16mm Screw x 3 30mm Black Screw x 14 Nail Bag Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed ...

Page 4: ... screwing though the Window Block No 20 with 2x30mm screws as shown in the illustration 6x30mm screws 11 12 30mm screw a b A b 19 7 a 20 1 2 Pre drill hole Step 2 Parts needed No 1 QTY 1 No 6 QTY 1 No 19 QTY 2 Place the Door Panel within the Door Gable No 1 on a flat level surface and place the Door No 6 into the door opening It is important that the door is placed central in the space provided wi...

Page 5: ...or sheet and mark the centers of joists onto either end Fix using 4 x30mm screws per joist Place the floor on your firm and level base ensuring base has suitable drainage free from areas where standing water can collect 16x30mm screws 30mm screw 4 10 1 2 Pre drill hole Step 4 Parts needed No 2 QTY 1 No 3 QTY 1 Locate the Plain Gable No 2 to a Plain Side No 3 Fix together by securing at the corners...

Page 6: ...ng 3x50mm screws per corner Position the panels so there are equal gaps between the floor and cladding Do not secure the building to the floor until after the roof has been fitted 9x50mm screws 50mm screw 1 3 1 2 Pre drill hole 2 a a a a a a a a a a Step 6 Parts needed No 8 QTY 1 No 18 QTY 2 Place the Ridge Bar No 8 in between the Door Gable No 1 and Plain Gable No 2 Ensure the top corners of the ...

Page 7: ...per sheet 10x30mm screws 20x40mm screws 30mm screw 40mm screw a b b 1 2 Pre drill hole 9 a 5 Step 8 Position the building square between the floor and cladding Fix the building to the floor using 50mm screws as shown in the illustration Use 3x50mm screws per panel making sure to screw through the framing into the floor 12x50mm screws 50mm screw 1 2 Pre drill hole a a a a a a a Step 9 Parts needed ...

Page 8: ...ensuring there is a 50mm overhang around the sides 60x Felt tacks Felt tacks 1 2 Pre drill hole 1 2 21 Step 11 Parts needed No 11 QTY 5 No 13 QTY 2 Locate the Fascias No 11 on to the front and back of the playhouse and Fix with 2x40mm screws per Fascia Locate the Finials No 13 centrally over the fascias and fix in place using 2x40mm screws per Finial Ensure to the trap the felt between the fascia ...

Page 9: ...ns and ropes IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD P 9 Please retain product label and instructions for future reference DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY Step 12 Parts needed No 14 QTY 1 No 15 QTY 1 No 16 QTY 1 No 17 QTY 1 Place the Window Cross No 16 against the inside of the window Position the frame centrally to the ...

Reviews: