Mercia Garden Products 01SHPWOR2010DDOW-V2 General Instructions Manual Download Page 5

P 5

Fix the remaining window sides 

and plain sides with 50mm screws 

as shown in diagram.

15x50mm Screws

7

50mm 

screw

Pre drill 

hole

7

7

Step 7

Fix the Door Gable (refer to steps 1 

and 2 if you have not already 

assembled this) at the corners with 

50mm screws as shown in diagram.

6x50mm Screws

50mm 

screw

Pre drill 

hole

Step 8

Fit the Door Gable Rail between the 

Front Gable Left and Right. Fix to the 

floor using 3x50mm screws. Ensure 

screws line up with the framing.

3x50mm screws

50mm 

screw

Pre drill 

hole

Measure the length of the door gable 

rail and cut down a strip to match.

Fix in place using 2x30mm screws.

2x30mm screws

30mm 

screw

Pre drill 

hole

*Cut down 

trims to fit

Step 9

2

1

3

18

22

6

6

Summary of Contents for 01SHPWOR2010DDOW-V2

Page 1: ...ons For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortun...

Page 2: ...1720mm Qty 4 18 19 Finial Qty 2 24 29 26 T Hinge Qty 9 Felt 30 Casement stay QTY 3 Butt hinge QTY 6 Open Window QTY 3 31 27 28 Tower Bolt QTY 2 25 7 11 12 16 Door Gable Strip 2552mm Door Strip 2800mm...

Page 3: ...screws 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they are...

Page 4: ...ole 9 Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and c...

Page 5: ...mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole Step 8 Fit the Door Gable Rail between the Front Gable Left and Right Fix to the floor using 3x50mm screws Ensure screws line up w...

Page 6: ...hinge to the framing on the back of each door Secure the doors onto the assembled gable as shown in the illustration Ensuring that the screws go through the cladding and into the framing behind 72x30m...

Page 7: ...w Pre drill hole Place the fist two roof sheets ontop of the plain gable and truss making sure the roof sheet sits into the gables and truss securing using 40mm screws Ensure there is an eqal amount o...

Page 8: ...hole HANDLE WITH CARE 1 2 3 4 245 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below On...

Page 9: ...drill to avoid splitting 34x40mm Screws 19 17 17 40mm screw Pre drill hole Attatch faisca s to the roof leaving a slight overhang at the top Fit the fascias to the roof over the felt and secure in pl...

Page 10: ...the opening windows instead of fixing butt hinges to the opening window use 4x30mm screws to attach the opening windows to the window panel as shown in the diagram 3x30mm Screws SCREW COUNT PER WINDO...

Page 11: ...side door with 6x30mm screws to side door along the horizontal door brace Then fix the tower bolt retainer to the vertical door panel framing using 4x30mm screws 10x30mm screws Step 22 25 To fix the l...

Page 12: ...P 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back...

Reviews: