background image

H=220cm W=140cm L=130cm

30mm Black Screw x 12

P 2

01SHPWOR1010DDOW-V1

Please retain product label and instructions for future reference

             

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

Overall Dimensions:

 

Length = 3114mm 

Width = 3179mm

Height = 2485mm

Base Dimensions: 

Length = 3010mm

Width = 2980mm

Building content

2

1

3

4

5

6

Plain Side

Qty 2

Window Side

Qty 2

Floor

Qty 4

Roof Panel

Qty 2

8

Front

Gable

Right

Front

Gable

Left

Front

Gable

Top

Back Gable

Right

Back Gable

Left

9

Truss Block - 160mm Qty 2

Door Gable Rail - 1332mm Qty 2

Tower Catch Block - 118mm Qty 2

15

12

13

16

14

18

Truss

Plain Gable Strip - 2387mm Qty 1

Cover Trim - 1757mm Qty 11   

19

Finial 

Qty 2

22

21

T Hinge

Qty 6

Felt

25

26

casement stay 
QTY 2

Butt hinge QTY 4

23

27

Rim Lock

& Handle

24

Tower Bolt QTY 2

28

7

10

Master

Door

Slave

Door

11

17

Door Gable Strip - 2552mm

Cover Strip - 2800mm Qty 3

20

Gable Block - 342mm 

Plain Gable Board

29

Window
QTY 2

Nail Bag

30mm Screw x 85

20mm Screw x 12

50mm Screw x 82

70mm Screw x 6

40mm Screw x 106

Felt Tacks x 170

16mm Screws x 12         

100mm Screw x 2

Remove transportation 
blocks from the bottom 
of each panel before 
beginning assembly. Each 
Panel should have two 

Pre Assembly 

Door Gable Assembly 

Step 1

2 x 50mm screws

Lay the Front Gable Right and Front Gable 
top on a level floor place them next to each 
other, ensure they are level at the top then 
fix together using 2x50mm screws. Stagger 
the screws so they do not collide.

1

3

50mm 

screw

Pre drill 

hole

Summary of Contents for 01SHPWOR1010DDOW-V1

Page 1: ...work and annual treatment Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level we cannot accept respons...

Page 2: ...ip 2387mm Qty 1 Cover Trim 1757mm Qty 11 19 Finial Qty 2 22 21 T Hinge Qty 6 Felt 25 26 casement stay QTY 2 Butt hinge QTY 4 23 27 Rim Lock Handle 24 Tower Bolt QTY 2 28 7 10 Master Door Slave Door 11...

Page 3: ...m screws 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they ar...

Page 4: ...hole 8 Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and...

Page 5: ...crew Pre drill hole Step 8 Fix the Door Gable refer to steps 1 and 2 if you have not already assembled this at the corners with 50mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole...

Page 6: ...Step 10 30mm screw Pre drill hole Step 11 Place a Truss central to where two panels join Align the top of the truss with the top of the sides as shown in the diagram HINT Use a piece from the fixing k...

Page 7: ...and fix using 40mm screws Ensure there is an equal amount of overhang on either side of the roof 12x40mm Screws 40mm screw Pre drill hole Place the second roof sheet ontop of the truss and ensure that...

Page 8: ...l hole HANDLE WITH CARE 1 2 3 4 170 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below...

Page 9: ...where the two back gables join using 4x40mm screws Pre drill to avoid splitting 28x40mm Screws 20 18 18 40mm screw Pre drill hole 16x40mm Screws Fit the fascias to the roof over the felt and secure i...

Page 10: ...ap in the window panel and fix with 3x30mm screws per strip Measure and trim before fitting If you would like the windows to be opening use the butt hinges to attach the opening window strip and the o...

Page 11: ...ews 24 Rim lock fixing Fig 1 internal view Place the lock onto internal horizontal framing ensure alignment with the pre drilled holes before fixing Align Lock keep with lock and fix with screws provi...

Page 12: ...P 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back...

Reviews: