background image

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, you must pilot 

drill all screw holes and ensure all 

screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(

not supplied) 

including

 

 a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the 
highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot 
accept responsibility for your safety whilst erecting or 
using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

**Protim Fentex E5**

Biocidal Product Regulation (EU 528/2012) 

Article 58 Information

Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products. 

Wood correctly preserved with Protim Fentex E2 is protected against mould in storage. 

Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

Refer to the instructions pages for you specific product code

14/01/2014

01SHPWOR1010DDOW-V1

10x10 Shiplap Workshop with double doors, opening windows, T & G floor and roof.

12x10 Shiplap Workshop with double doors, opening windows, T & G floor and roof.

16x10 Shiplap Workshop with double doors, opening windows, T & G floor and roof.

20x10 Shiplap Workshop with double doors, opening windows, T & G floor and roof.

01SHPWOR1210DDOW-V1

01SHPWOR1610DDOW-V1

01SHPWOR2010DDOW-V1

Summary of Contents for 01SHPWOR1010DDOW-V1

Page 1: ...work and annual treatment Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level we cannot accept respons...

Page 2: ...ip 2387mm Qty 1 Cover Trim 1757mm Qty 11 19 Finial Qty 2 22 21 T Hinge Qty 6 Felt 25 26 casement stay QTY 2 Butt hinge QTY 4 23 27 Rim Lock Handle 24 Tower Bolt QTY 2 28 7 10 Master Door Slave Door 11...

Page 3: ...m screws 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they ar...

Page 4: ...hole 8 Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and...

Page 5: ...crew Pre drill hole Step 8 Fix the Door Gable refer to steps 1 and 2 if you have not already assembled this at the corners with 50mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole...

Page 6: ...Step 10 30mm screw Pre drill hole Step 11 Place a Truss central to where two panels join Align the top of the truss with the top of the sides as shown in the diagram HINT Use a piece from the fixing k...

Page 7: ...and fix using 40mm screws Ensure there is an equal amount of overhang on either side of the roof 12x40mm Screws 40mm screw Pre drill hole Place the second roof sheet ontop of the truss and ensure that...

Page 8: ...l hole HANDLE WITH CARE 1 2 3 4 170 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below...

Page 9: ...where the two back gables join using 4x40mm screws Pre drill to avoid splitting 28x40mm Screws 20 18 18 40mm screw Pre drill hole 16x40mm Screws Fit the fascias to the roof over the felt and secure i...

Page 10: ...ap in the window panel and fix with 3x30mm screws per strip Measure and trim before fitting If you would like the windows to be opening use the butt hinges to attach the opening window strip and the o...

Page 11: ...ews 24 Rim lock fixing Fig 1 internal view Place the lock onto internal horizontal framing ensure alignment with the pre drilled holes before fixing Align Lock keep with lock and fix with screws provi...

Page 12: ...P 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back...

Reviews: