Mercia Garden Products 01RAW2010DDOW-V3 General Instructions Manual Download Page 7

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Please retain product label and instructions for future reference

             

Step 16

Fit the cover trims and finials to

the gable sides securing with

12x40mm screws as shown in

the illustration.

*Before fixing into place measure

and cut down the cover trims to

size.

12x40mm Screws

*

Cut down trims to fit

40mm 

screw

Pre drill 

hole

12

12

21

12

12

21

Step 14

Fix the casement say to the

window then align the fixings

to the window panel.

*Ensure the casement stay fits

onto the fixings before securing

in place.

18x16mm Screws

16mm                                  

screw

Pre drill 

hole

30mm 

screw

Pre drill 

hole

30mm 

screw

22

19

Step 15

Attach the door strips to the door

panel framing either side of the

door using 3x30mm screws per

strip.

Place the Cloaking Strip to the 

rear of one of the doors. Fixing in 

position screwing through the door  

into the cloaking strip with 3x30mm

screws.

Align the tower bolts onto the

vertical framing of the slave

door, secure the bolts to the

top and bottom using 6x30mm

black screws per tower bolt.

Mark the position of the bolt

& drill a hole above and below

for the bolt to catch in to.

16x30mm Black Screws

6x30mm Black Screws

24

15

Summary of Contents for 01RAW2010DDOW-V3

Page 1: ...can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry s...

Page 2: ...QTY 17 Door Strip 1600mm QTY 2 Gable Block QTY 2 Truss Block QTY 6 Gable Board QTY 2 T Hinge QTY 6 Butt Hinge QTY 6 Finial QTY 2 Casement Stay QTY 3 Tower Bolt QTY 2 Pre Assembly Remove the transporta...

Page 3: ...e floor and fix in place Fix the corners with 50mm screws Do not secure the building to the floor until the roof is fixed 3x50mm Screws a b a b b a a a Step 4 Following the same method outlined in ste...

Page 4: ...ons for future reference Step 8 Locate the truss centrally inbetween each panel in the building Align the top of the truss with the top of the gables Use a piece from the fixing kit as a guide Pencil...

Page 5: ...ion screwing through the boards into the gable and truss framing 52 x30mm Screws Step 10 Once the roof is fixed secure the building to the floor with 36x50mm screws 56x50mm Screws b Step 11 Cut the fe...

Page 6: ...If you would like the window to be fixed secure the window into the gap using 4x30mm screws Ensure to screw through the window into the panel framing 12x30mm Screws b a Please retain product label an...

Page 7: ...to the window then align the fixings to the window panel Ensure the casement stay fits onto the fixings before securing in place 18x16mm Screws 16mm screw Pre drill hole 30mm screw Pre drill hole 30mm...

Reviews: