P 5
Please retain product label and instructions for future reference
Internal View
External View
Step 8
Fix the T-hinges (No. 13) to the doors with
30mm screws ensuring to locate
the screws into the door framing.
Position each door (No. 4) into the door
gap on Front Panel (No.1) leaving 2mm
gap between the doors and the building.
Fix in place using 30mm screws.
Secure the door block (No. 8) & turn
buttons (No. 12) to the top & bottom
framing of the door with the
retainer attached, using 30mm
screws.
Attach the pad bolts (No. 14) to the
horizontal brace and add door blocks ( No.8)
to either door and the bolt
retainer on the opposite door.
58x30mm Screws
Pre drill
hole
30mm
screw
13
14
12
12
8
8
12
11
11
10
Step 9
Fit the fascia boards (No.10, 11) to the
rear and sides of the building
using 3x40mm screws per
fascia.
9x40mm Screws
Pre drill
hole
40mm
screw
8
14