Mercia Garden Products 01OVLPA1208DDFW-V1 General Instructions Manual Download Page 4

P 4

Step 5

Ridge Bar Assembly

Position the two parts of the ridge 

bar within the ‘U’ channel and 

secure from either side with 3 x 

30mm screws and 4 x 30mm screws 

from underneath. Secure an ‘L’ 

bracket to either end of the ridge 

bar using 2 x 30mm screws per 

bracket.

18x30mm Screws

27

8

8

24

243

Place the roof support bar in 

between the front and back panels. 

Ensure the top corners of the 

support bar are flush with each top 

point. Secure in place using the L 

Bracket on each end with 4x30mm 

screws.

30mm 

screw

Pre drill 

hole

Step 6

i)Position a truss frame to the ridge 

bar sloping down towards the 

building side, ensure it is central to 

the middle upright of the panel. Fix 

with a 50mm screw through the 

ridge bar into the truss frame. 

ii) Align the second truss frame with 

the first on the opposite side of the 

ridge bar and fix with a 50mm 

screw at an angle as illustrated.

ENSURE SUPPORT BARS 

ARE MANUALLY SUP-

PORTED UNTIL FIXED AT 

BOTH ENDS

i

ii

4x50mm Screws

50mm 

screw

Pre drill 

hole

9

9

9

9

9

9

Step 7

ii

i

i) Fix the truss block to the side 

panel framing with 2 x 50mm 

screws. Position the block at the 

top of the framing with the 

angle pointing upwards into the 

building, aligning the block 

centrally along the join between 

the side panels with one screw 

in each panel.

ii) Fix the support bar to the 

block using 1 x 50mm screw.

6x50mm Screws

50mm 

screw

Pre drill 

hole

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Step 8

Fix a Truss support between the 

two truss frames and fix in place 

using 40mm screws, ensure you 

pre-drill holes before fixing 

together.

4x40mm Screws

40mm 

screw

Pre drill 

hole

11

11

11

11

11

11

10

10

10

Summary of Contents for 01OVLPA1208DDFW-V1

Page 1: ...t the timber from deteriorating and to waterproof it This is required to maintain the anti rot guaran tee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a...

Page 2: ...01OVLPF1753X1175 V1 Roof QTY 4 PI 03 0229 Door QTY 2 AI 01MBDR1660X439 V1 8 9 11 12 13 14 15 16 17 20 10 Ridge Bar 27x70x1735mm QTY 2 F2770 1735mm Truss Frame 27x44x1262mm QTY 6 F2744 1302mm 1262mm f...

Page 3: ...rew Pre drill hole 5 20 Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and cladding on all 4 sides Step 2 2 4 3x50mm Screws 50mm s...

Page 4: ...through the ridge bar into the truss frame ii Align the second truss frame with the first on the opposite side of the ridge bar and fix with a 50mm screw at an angle as illustrated ENSURE SUPPORT BARS...

Page 5: ...ace two roof sheets ontop of the plain gable and truss making sure the roof sheet sits flush to the outside edge of the plain gable and fix using 40mm screws Before fixing the roof sheet to the truss...

Page 6: ...NDLE WITH CARE 1 2 3 4 23 Step 13 Fit the cover trims to the building and secure in place with 40mm screws as shown Pre drill to avoid splitting 18x40mm Screws 16 16 16 16 16 16 40mm screw Pre drill h...

Page 7: ...0mm Screws 30mm screw Pre drill hole 19 19 Place the plastic window cill onto the Window Panel and silicone in place as shown on both diagrams to the left Side View Styrene Window Cill SILIC O N E SEA...

Page 8: ...en properly 5x30mm Screws a Use 1x30mm screw to secure the turn button to the master door 1x30mm Black Screws b 15 14 30mm screw Pre drill hole 30mm screw 26 It is ESSENTIAL that you apply wood treatm...

Reviews: