P 4
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Step 5
Fix two eaves frames to each roof sheet
using 3x30mm screws per eave.
Fix the roof sheets to the roof ensuring
they come together at the top using
40mm screws directly through the roof
sheet at the top. Make sure to attach the
roofs to the ridge bar.
15
15
6
12x 30mm Screws
32x 40mm Screws
40mm
screw
Pre drill
hole
Pre drill
hole
30mm
screw
Step 6
b
Once the roof is fixed
attach the building to
the floor with 50 mm
screws.
16x 50mm Screws
50mm
screw
Pre drill
hole
104x Tacks
Felt
tacks
21
HANDLE
WITH CARE
1
2
3
4
Step 7
Cut the felt into 2490mm long
sheets and lay onto roof as
shown in diagram ensuring
there is overhang around the
sides then nail the felt tacks
every 100mm.
Lay the capping felt over the
centre of the apex as shown
in the diagram ensuring there
is overhang around the sides.