P 4
Step 5
Fix two eaves frames to each roof sheet
using 3x30mm screws per eave.
Fix the roof sheets to the roof ensuring
they come together at the top using
40mm screws directly through the roof
sheet at the top. Make sure to attach the
roofs to the ridge bar.
16
6
30mm
screw
16
12x 30mm Screws
28x 40mm Screws
40mm
screw
Pre drill
hole
Pre drill
hole
Step 6
b
Once the roof is fixed
attach the building to
the floor with 50 mm
screws.
16x 50mm Screws
50mm
screw
Pre drill
hole
100x Tacks
Felt
tacks
21
22
22
21
Step 7
Cut the felt into 2 sheets at 2490mm and
fix onto the roof using felt tacks as shown
in diagram ensuring there is 50mm
overhang around the sides. Cut the
capping felt to 2490mm and fix over the
centre of the apex as shown in the
diagram ensuring there is 50mm over-
hang around the sides.
HANDLE
WITH CARE
1
2
3
4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk