background image

P 4

Step 5

Fix two eaves frames to each roof sheet 

using 3x30mm screws per eave.

Fix the roof sheets to the roof ensuring 

they come together at the top using 

40mm screws directly through the roof 

sheet at the top. Make sure to attach the 

roofs to the ridge bar. 

16

6

30mm 

screw

16

12x 30mm Screws
28x 40mm Screws

40mm 

screw

Pre drill 

hole

Pre drill 

hole

Step 6

b

Once the roof is fixed 

attach the building to 

the floor with 50 mm 

screws.

16x 50mm Screws

50mm 

screw

Pre drill 

hole

100x Tacks

Felt 

tacks 

21

22

22

21

Step 7

Cut the felt into 2 sheets at 2490mm and 

fix onto the roof using felt tacks as shown 

in diagram ensuring there is 50mm 

overhang around the sides. Cut the 

capping felt to 2490mm and fix over the 

centre of the apex as shown in the 

diagram ensuring there is 50mm over-

hang around the sides.

HANDLE

WITH CARE

1

2

3

4

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Summary of Contents for 01OVLPA0806DDFW-V2

Page 1: ...annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treat ment to prevent water ingress Pressure Treated buildings Require a waterproof treatment to prevent water ingress Log Cabins Are supplied untreated and require a prese...

Page 2: ...rene QTY 2 FW ONLY PI 05 0114 18 19 21 L Bracket QTY 2 PI 07 0012 16 Capping Felt Turn Button QTY 3 PI 07 0034 20 22 15 Eaves Frame 28x28x1195mm QTY 4 F2828 1195 24 23 Door Gable QTY1 AI 01OVLPDG1707x1960 V2 Back Gable QTY1 AI 01OVLPPG1707x1974 V3 Plain Side QTY 2 NW ONLY AI 01OVLPPS2360x1567 V3 Window Panel QTY 1 FW ONLY AI 01OVLPWS2360x1567 V2 Floor QTY 1 AI 01OVLPF2350x1753 V2 Roof QTY 2 PI 03 ...

Page 3: ... diagram Position the panels so there is equal spacing between the floor and cladding on all 4 sides Step 2 3x50mm Screws Pre drill hole 50mm screw Step 3 9x50mm Screws Fix the corners with 50mm screws as shown in diagram 1 4 Use for no window buildings 3 Pre drill hole 50mm screw Step 4 8x20mm Screws Place the ridge bar in between the front and back gables Ensure the top corners of the ridge bar ...

Page 4: ...m screw Pre drill hole Pre drill hole Step 6 b Once the roof is fixed attach the building to the floor with 50 mm screws 16x 50mm Screws 50mm screw Pre drill hole 100x Tacks Felt tacks 21 22 22 21 Step 7 Cut the felt into 2 sheets at 2490mm and fix onto the roof using felt tacks as shown in diagram ensuring there is 50mm overhang around the sides Cut the capping felt to 2490mm and fix over the cen...

Page 5: ...ne sheets on top of the window cill When positioning the styrene sheets ensure there is an equal distance between them and at either side of the windows Fix the window strips to the two pieces of framing that sit alongside the outside edges of the window with 3x30mm screws for each strip Attach the three window strips at either side of the windows using 3x30mm screws each Make sure the screws ente...

Page 6: ...screws by screwing through the outside of the door into the block 8x30mm Screws 2x30mm Black Screws 4x30mm Screws b c a 13 20 14 a 13 20mm screw 30mm screw Use 5x20mm screws to fix the door strips to the right hand door Note Door Strips must be attached to right hand door Use 1x30mm black screw to fix the turn button onto the left hand door 5 x 20mm Screws 1x 30mm Black Screw Step 12 12 11 20 It i...

Reviews: