background image

01OVEABKSTR-V2

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

Overlap Bike Store

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, you must pilot 

drill all screw holes and ensure all 

screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(not supplied) including  a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the 
highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot 
accept responsibility for your safety whilst erecting or 
using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

**Protim Fentex E5**

Biocidal Product Regulation (EU 528/2012) Article 58 Information

Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products. 

Wood correctly preserved with Protim Fentex E2 is protected against mould in storage. 

Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

01BIK0703-V1

Shiplap Bike Store

Refer to the instructions pages for you specific product code

Summary of Contents for 01OVEABKSTR-V2

Page 1: ...sure the product is placed on a suitable base BUILDING A BASE When thinking about where the building and base is going to be constructed Ensure that there will be access to all sides for maintenance work and annual treatment Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level we cannot accept responsi...

Page 2: ...ves 825mm QTY 2 Roof Support 744mm Bolt Block 132mm QTY 4 Turn Button QTY 2 L Bracket QTY 2 T Hinge QTY 4 Pad Bolt Felt Nail Bag Felt Tacks x 30 30mm Black Screw x 2 30mm Screw x 92 40mm Screw x 10 50mm Screw x 30 Remove transportation blocks from the bottom of each panel before beginning assembly Each Panel should have two Pre Assembly 30mm screw Attach the doors to the door gable with the hinges...

Page 3: ...cket s onto the central vertical framing of the door and plain gables using 4x30mm screws Rest the support bar onto the L Brackets Fix in place using 4x30mm screws Step 4 Attach the eaves to the roof sheets using 3x30mm screws per panel Secure the roof into place using 8x30mm screws ensure to screw roof sheets into the panel framing b b b b b b b b b b 3x50mm Screws Pre drill hole 50mm screw 9x50m...

Page 4: ...28x Felt Tacks Step 6 Secure the building to the floor using 12x50mm screws 12x50mm Screws Pre drill hole 50mm screw Step 7 Fix the fascias and finials into place front and back using 16x30mm screws 16x30mm Screws Pre drill hole Step 8 Attach the bolt blocks to the doors using 2x40mm per block as shown in the diagram Screw through the cladding into the blocks 40mm screw 8x40mm Screws Pre drill hol...

Page 5: ... reference Step 9 Fix the turn buttons to the top and bottom blocks using 2x30mm Black Screws 2x30mm Black Screws Pre drill hole Step 9 Fix the pad bolt to the door using 8x30mm screws Ensure the pad bolt lines up with the block on the back Attach the retainer to the opposite door in line with the bolt using 4x30mm screws 11 16x30mm Screws Pre drill hole 30mm screw ...

Reviews: