P 3
Please retain product label and instructions for future reference
Nail Bag
There may be extra screws present in the nail bag
50mm Screw x 58
20mm Screw x 8
40mm Screw x 34
30mm Screw x 116
60mm Screw x 10
Felt Tacks x 100
Remove transportation
blocks from the bottom of
each panel before beginning
assembly. Each Panel should
have two blocks.
Pre Assembly
Step 1
Parts needed - No. 1 QTY 1
No. 6 QTY 1
No. 21 QTY 3
Place the door
(No. 6)
within the
Door Panel
(No. 1)
. Fix the T Hinges
(No. 21)
onto the door
and Door
Panel as shown
(taking into account
on which side of the Door Panel
opening you want the Door to open)
.
Ensure that the screws go through the
cladding and into the framing behind.
21x30mm Screws
21
Pre drill
hole
30mm
screw
1
6
**PLEASE NOTE**
Before fitting the
hinges, ensure the door is in the correct
position depending on which side you
want the door to open. See external
illustrations below which show the doors
internal framing.
Opens from the Left
Opens from the Right