P 5
Please retain product label and instructions for future reference
Pre drill
hole
40mm
screw
5
5
Step 8
Use 40mm screws to fix roof
(No. 5)
down
the sides and at the bottom being sure
that the screws attach into the framing
below.
16x40mm Screws
Step 9
Once the roof has been fully secured the
building can be fixed to the floor.
Screw down through the framing of the
panels and into the floor bearers using
2x50mm screw for the side panels and
3x50mm screws for the gables.
10x50mm screws
Pre drill
hole
50mm
screw
Step 7
Parts needed - No. 5 QTY 2
Place the Roof Panels
(No. 5)
on top of the
building making sure the framing in the roof
panels sits firmly within the Gable Panels
(No. 1 &
2)
and on top of the Ridge Bar
(No. 10)
.
**Make sure that you have got the roof panels
the correct way round with the recess at the
top of the apex as shown in the diagram.**
**The edges of the roof panels must be flush
with the outer cladding of the Gable Panels
(No. 1 & 2).**
From the top, fix directly through the roof panels
(No. 5)
and into the ridge bar
(No. 10)
below
using 4x60mm screws per Roof Panel.
It is essential that the ridge bar
(No. 10)
and roof
panel
(No. 5)
framing pull together when fixed
with 60mm screws. You may require another
person pushing the ridge bar
(No. 10)
up
from below to achieve this.
**HINT - Follow the nailing line of the
framing on the roof panel so that you
are more likely to fix into the ridge bar
below. **
8x60mm Screws
60mm
screw
Pre drill
hole
5
5