
P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
Step 1
Parts Needed- No.7 QTY 1
Place the floor
(No.7)
on a firm and
level base, ensure the base has
suitable drainage free from areas
where standing water can collect. See
the front page for base requirements.
7
1
20
20
20
8
Step 2
Parts needed - No. 1 QTY 1
No. 8 QTY 1
No. 20 QTY 3
Place the door
(No.8)
within the
Door Panel
(No. 1)
. Fix the T Hinges
(No. 20)
onto the door
and Door
Panel as shown
(taking into account
on which side of the Door Panel
opening you want the Door to open)
.
Ensure that the screws go through the
cladding and into the framing behind.
21x30mm Screws
Pre drill
hole
30mm
screw
**PLEASE NOTE**
Before fitting the
hinges, ensure the door is in the correct
position depending on which side you
want the door to open. See external
illustrations below which show the doors
internal framing.
20
Opens from the Left
Opens from the Right
Summary of Contents for 01DTOVRA0604SDFW-V1
Page 8: ...2 1 3 4...
Page 9: ...1 2...