Mercia Garden Products 01DTOVRA0604SDFW-V1 General Instructions Manual Download Page 3

P 3

Please retain product label and instructions for future reference

             

Pre Assembly

Before assembling remove the transportation

blocks from the bottom of each panel.

Take care removing the blocks as to not damage

the panels. Tap with a flat headed screwdriver 

and hammer.

Dispose of the blocks once removed.

Step 1

Parts Needed- No.7 QTY 1

Place the floor 

(No.7)

 on a firm and 

level base, ensure the base has 

suitable drainage free from areas 

where standing water can collect. See 

the front page for base requirements.

7

1

20

20

20

8

Step 2

Parts needed - No. 1  QTY 1

                                 No. 8  QTY 1

                                 No. 20 QTY 3

Place the door 

(No.8)

 within the 

Door Panel 

(No. 1)

.  Fix the T Hinges

(No. 20)

 onto the door

 

and Door 

Panel as shown 

(taking into account

on which side of the Door Panel

opening you want the Door to open)

.  

Ensure that the screws go through the 

cladding and into the framing behind.

21x30mm Screws

Pre drill 

hole

30mm 

screw

**PLEASE NOTE**

  Before fitting the 

hinges, ensure the door is in the correct

position depending on which side you

want the door to open.  See external 

illustrations below which show the doors

internal framing. 

20

Opens from the Left

Opens from the Right

Summary of Contents for 01DTOVRA0604SDFW-V1

Page 1: ...id placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions...

Page 2: ...83X1799 V1 Plain Panel 2 QTY 1 AI R11OVPP1180X1799 V1 Roof QTY 2 PI 03 0222 Floor QTY 1 AI R11OSBF1175X1753 V1 Door QTY 1 AI R11FBMBZBD660X1660 V1 Door Block 150x28x28mm QTY 1 F2828 150mm Ridge Bar 17...

Page 3: ...See the front page for base requirements 7 1 20 20 20 8 Step 2 Parts needed No 1 QTY 1 No 8 QTY 1 No 20 QTY 3 Place the door No 8 within the Door Panel No 1 Fix the T Hinges No 20 onto the door and D...

Page 4: ...between the floor and clad ding 6x50mm Screws 2 5 a a a a a a Please note the front and back panels are interchangeable and can be positioned on either side of the building Decide which works best be...

Page 5: ...have got the roof panels the correct way round with the Eaves Framing to the front and back of the building From the top fix directly through the roof panels No 6 and into the ridge bar No 10 below u...

Page 6: ...he window strips No 13 and No 14 to either side of the windows and the top Secure into place using 3x30mm screws per strip 2x20mm screws 9x30mm Screws Pre drill hole 20mm screw a b c Styrene Window Ci...

Page 7: ...Fascias and into the plain gable 16x30mm Screws 30mm screw Pre drill hole 16 24 16 24 16 16 Fix the Door Beading strips No 12 to the door panel framing secure using 4x30mm Screws per strip Fix the doo...

Page 8: ...2 1 3 4...

Page 9: ...1 2...

Page 10: ...abel and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Reviews: