background image

P 4

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Please retain product label and instructions for future reference

             

Step 7

 

Once the roof has been fixed

 

into place secure the   

 

 

building to the floor using

 

20x50mm screws.

*Ensure to screw through the panel 

framing into the floor bearers 

below.

20x50mm screws

Step 6

Attach an eaves frame (

No. 8

) to one

edge of each roof sheet (

No. 5

) using

4x30mm screws per roof.

Fix each roof onto the building with

16x30mm screws per roof, making

sure the sheets meet at the apex.

40x30mm Screws

Pre drill 

hole

30mm 

screw

5

8

b

b

b

b

b

b

b

b

Step 8

Place a cover trim (

No. 9

)

at each corner of the 

building & fix into position 

using 3x30mm screws per 

strip.

12x30mm Screws

Pre drill 

hole

50mm 

screw

Pre drill 

hole

30mm 

screw

9

9

9

9

Summary of Contents for 01COMGRN0406-V1

Page 1: ...ditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfo...

Page 2: ...or AI 01 21ZB544X1660 V1 6 7 Ridge Bar 28x28x1138mm FS2828 1138mm 8 Eaves Frame 28x28x1217mm QTY 2 FS2828 1217mm 9 Cover Strip 40x12x1566mm QTY 6 S1240 1566mm 10 Fascia 60x12x1053mm QTY 4 S1260 1053mm...

Page 3: ...ce Ensure your base has suitable drainage and is free from areas where standing water can collect a b a a b b b b b b Step 4 Following the same method outlined in Step 3 place the second plain panel a...

Page 4: ...crews Step 6 Attach an eaves frame No 8 to one edge of each roof sheet No 5 using 4x30mm screws per roof Fix each roof onto the building with 16x30mm screws per roof making sure the sheets meet at the...

Page 5: ...ructions before beginning assembly Not every panel from the greenhouse will be used Step 9 Cut the felt into three strips and lay onto the as shown in the illustration Ensure there is approximatley 50...

Page 6: ...ed Secure the base frames together at each corner using 8x70mm screws See greenhouse nail bag 8x70mm Screws Pre drill hole 70mm screw Step 12 internal Place the two window panel s onto the base frame...

Page 7: ...nto the assembly and secure into position using 50mm screws See greenhouse instructions for screw quantities Door side panel size 610mm a Pre drill hole 50mm screw a a a a a a a a Step 14 internal Att...

Page 8: ...ies Pre drill hole 20mm screw 11 Step 17 internal Place the greenhouse roof frame s No 11 See front page against each window panel and secure in place using 3x50mm screws per frame ensuring to screw i...

Page 9: ...the illustration using 2x50mm screws See greenhouse instructions for screw quantities 2x50mm Screws Pre drill hole 50mm screw Step 21 internal Fix the door to building using 16x16mm black screws Attac...

Page 10: ...from your product in regards to the number of windows however the principle is the same Step 22 internal Attach the fascia s from the greenhouse See greenhouse instructions to the front of the buildin...

Page 11: ...al Follow the instructions supplied with the greenhouse to build the next section Do NOT attach the fascia s until after the building s have been connected See greenhouse instructions for screw quanti...

Page 12: ...hole 70mm screw Internal 10 10 15 10 10 Step 27 external Attach the fascia s from the greenhouse See greenhouse instructions to the front of the building using 6x40mm screws At the rear of the buildin...

Page 13: ...NT score around protective cover on glazing and carefuly peel covering back SILICONE SEALANT Step 28 external It is advisable to seal around all window framing with silicone sealant not included to mi...

Reviews: